Repair or replace, without a magic age
Age is a clue, not a switch. The Forest Service table is old, and it labels the figures as typical ranges. It credits the National Roofing Contractors Association. It is not a warranty and not a Spokane law.
USDA Forest Service facilities table, slide 33. Asphalt composition shingles are also listed at 15 to 30 years. An asphalt overlay is listed at 25 to 35, but Spokane stops you at two layers, so a third-layer overlay is not a local option.
Tile is listed around 50 years and slate around 50 to 100. Built-up asphalt, a flat-roof system, is listed at 12 to 25. Those are ranges, not bids. Manufacturer warranty years were not in the files we used, so we do not quote a brand promise.
- The roof is younger than 15 years, the material is asphalt, and only a few shingles are damaged. Start with a repair conversation. Our repair page is the spot-fix guide.
- The field has lost grit on every slope, or leaks show up in more than one room. A replacement talk is fair. Still open the attic before you sign.
- One layer is up, and a second asphalt layer would still total two. The city form allows that path. It also still wants a deck inspection and the eave seal.
- Two layers are already on the house. They come off. Do not pay for an overlay the permit form rejects.
- The ridge sags or the deck feels soft. Do not score that as "maybe later." Get someone on the roof.
- A 20-year birthday is not an automatic tear-off. Twenty sits inside 15 to 30.
This list is a guide, not an inspection. A matched roofer's photos are the check. Keep them and use them on any other quote you get.
Signs the roof is worn out
Look from the yard and from the attic hatch. Do not climb. Missing tabs after a storm can be a repair. The signs below are about the whole roof.
| Sign | Where you see it | What to ask next |
|---|---|---|
| Grit loss across a slope | Gutters full of granules, shingles look bald | Is this one slope or the whole field? |
| Curled or cracked tabs | From the ground, with binoculars | Are matching shingles still made? |
| Stains around many penetrations | Ceiling spots under vents and the chimney | Is the flashing being rebuilt or sealed with coating? |
| Two layers at the rake | The sloped edge at the gable | Does the job include a full tear-off? |
| Dark, wet sheathing | Attic, along nails or a valley | Will the price include new boards if the wood fails? |
| No intake air | Insulation shoved into the soffit | Who fixes ventilation so the new roof is legal? |
Flashing is the metal at chimneys, sidewalls, skylights, and vents. A new shingle field on tired flashing is a new leak with a fresh date. Underlayment is the sheet under the shingles. At the eaves, Spokane wants that sheet upgraded: two cemented layers, or one self-sealing sheet. Measure that strip to 24 inches inside the outside wall, not merely down to the gutter. That strip is the ice barrier.
Heat from the house is what builds an ice dam, the frozen ridge that blocks meltwater. If the attic is warm and the eave is cold, a brand-new shingle will still dam. The permit form already requires adequate attic ventilation. Ask for that work as a line, not a verbal extra.
What a Spokane replacement includes
Nobody honest can promise a day count from a desk. Rotten wood, a steep pitch, and a snow day all move the job. What the city adds is a sequence. The 2020 form says the deck is inspected before new roofing goes on. A trade magazine reported that, starting as a pilot in July 2023 and made permanent in October 2023, house reroofs can send photos or video so the city inspector does the deck check and the final check remotely. Confirm that option is still open. The magazine is not the code book.
- PermitCity form for roofing, or the Valley re-roof form if you are there. The owner can apply in the Valley. The city form we read does not say that.
- Tear-off decisionCount layers. Two already up means they all come off.
- Deck lookBefore new roofing. Photos may be allowed on house reroofs. Rotten boards get replaced now.
- Eave seal and ventsIce barrier to 24 inches inside the wall. Attic air has to work.
- Shingles or metalThen flashing at every joint.
- Final checkThe city closes the permit. Keep that record with the photos.
| Need | Office | Phone |
|---|---|---|
| City form, deck check, current fee | Development Services, 808 W Spokane Falls Blvd | 509-625-6300 |
| Valley tear-off form | Valley permit center | 509-720-5240 |
| A stalled claim | Insurance consumer line | 800-562-6900 |
Spokane Valley's form, dated February 2025, adds three questions: tear-off or overlay, how many layers exist, and whether the deck will be re-sheeted. It warns that a structural analysis may be required. Structural analysis means an engineer looks at whether the frame can carry the roof. That shows up more often when heavy material replaces light shingles, or when snow load is in question. Valley permit center: 509-720-5240. City Development Services: 509-625-6300, 808 W Spokane Falls Blvd.
The city form is from August 19, 2020. Six years is long enough for a line to move. Read the current application before you bid the job, or ask the roofer to attach it to the quote.
Rules in one place
Snow load is the weight the roof is designed to carry, in pounds per square foot. We could not open a City of Spokane residential snow table. A March 15, 2022 commercial packet from the city shows 39 pounds per square foot on the ground. Do not treat that packet as the house rule. Inside Spokane Valley limits, the municipal code puts 39 psf on the ground and will not let the roof design sit under 30 psf. Coeur d'Alene publishes 40 on the roof and 60 on the ground, which is a different city and a different page.
| Question | Inside Spokane | Inside Spokane Valley |
|---|---|---|
| Layer limit | Two after the new roof. More than that, strip to the deck. | Form asks the layer count and tear-off or overlay. |
| Wood | Deck inspection before new roofing. | Form asks if you will re-sheet. A structural check may be required. |
| Eaves | Ice barrier 24 inches inside the wall line. | Not restated on the Valley form we read. Ask. |
| Attic | Adequate ventilation required. | Enclosed-space venting is a question for the permit center. |
| Who applies | Call the city. | Registered contractor or the owner. |
| Snow figure we could verify | 39 psf ground, commercial packet only. | 39 psf ground, 30 psf minimum on the roof. |
FEMA's DR-1825 is the local reminder that snow is not theoretical. It covers a severe winter storm and record snow, incident date December 12, 2008, declared March 2, 2009, for this county. Later winter declarations are DR-4309 (incident January 30, 2017) and DR-4593 (incident beginning December 29, 2020). Design the roof for the code number that applies to the address, not for a headline.
Sales tax generally hits the full contract. For a city address in the fourth quarter of 2026 the rate is 9.1%. Put it on the quote as its own line so a "roof price" and a "tax included price" are not mixed. The cost page multiplies that rate against the permit medians.
Money basics, without pretending to be a bid
City permit reports, February 2024 through March 2026. These are declared job values. The fee and tax arithmetic is on the cost page.
The permit middle, the size bands, the 2026 fee and the sales tax are on our Spokane roof replacement cost page.
Estimate your reroof cost by roof size
Bond and insurance are part of why a registered roofer cannot match a flyer with no number. The July 2026 state form sets a $30,000 bond or a $15,000 bond, and $250,000 of liability per occurrence. Which bond a roofing company posts was not stated. Look it up before the tear-off starts. The Spokane roofing page shows the lookup steps.
Asphalt or metal
We do not rank shingle brands, and we do not name installers. The life table is the sourced comparison.
The common house roof in the permit file. A second layer is possible only when the total stays at two. The eave still needs the ice barrier.
The same federal table gives metal a longer range. Spokane's public permits did not include enough metal jobs to price it. Ask about snow sliding and about whether the frame needs a look.
Flat roofs are a different system. Built-up asphalt is the 12-to-25-year line in the table. If the building is a business or a flat commercial deck, use the commercial roofing page rather than stretching house rules across it. A metal-only brief is at metal roofing.
Federal section 25C does not pay you back for a roof placed in service in 2026. If a quote subtracts a "tax credit," ask which law still allows it. Avista's attic-insulation rebate is real for some homes, and it is not a roof rebate. It can matter when the tear-off crew is already in the attic. The inspection page lists the rebate bands.
Free for you. The roofing company pays us a flat monthly fee. The Day Company is a free matching service, not a contractor. Before you hire any roofer, check their registration with Washington L&I or the Idaho Contractors Board. We do not answer, record or receive these calls.
How the person you hire gets checked
Search Verify a Contractor before the contract. If the company name is common, search the registration number. A workers' comp account or the UBI (the state business ID) will also open the record. Then match that number to the contract and to any ad. State law says an ad with a name or an address must show the number.
- The contract names squares, layers to remove, deck repairs as a unit price, ice barrier, flashing, ventilation, haul-off, tax, and the permit.
- You can see the insurance certificate, and Labor & Industries is the certificate holder.
- The price is a declared scope you could hand to the permit desk.
- The price is one round number with "roof" as the only word.
- Someone offers to cover your deductible. That offer, if it is a regular practice, violates Washington law.
- The crew starts tearing off before the permit path is clear.
One free inspection is the matching offer. The roofer writes a photo report. You can send the photo report to your insurer yourself if a storm is part of the story. In Washington, a contractor may point at damage when an adjuster visits, but only a licensed adjuster may negotiate how the policy pays. That is on the storm page. Choosing questions in a longer list is on how to choose a roofer.
Match with one local roofer for a free inspection and a photo report before you sign a tear-off price.
Questions, answered
When should I replace a Spokane roof?
When the wear is across the field, when leaks keep returning, or when a second layer is already up and the city form requires a tear-off. The federal life table puts asphalt at 15 to 30 years. Use that as a range, then confirm with photos of your roof.
Can the new roof go over the old shingles?
Yes only if the finished count is still two layers or fewer. The August 19, 2020 city form says two or more existing layers all come off. Count at the rake before you pay for an overlay.
Do I need a permit to replace a roof?
Yes, plan on one. Spokane and Spokane Valley each publish an application for this work. Phone 509-625-6300 inside the city and 509-720-5240 in the Valley, and ask them to send the form they use now. Ours was the 2020 city copy.
How long does a roof replacement take?
The roofer's crew time is theirs to state. The city adds a deck check before new roofing and a final check. A 2023 trade article said house reroofs can submit photos or video for those checks. Confirm that path, and do not accept a day count that ignores rotten wood.
Is there a tax credit for a new roof in 2026?
No. The IRS says section 25C is not available for property placed in service after December 31, 2025. Sales tax still generally applies to the full contract. The city rate for the last quarter of 2026 is 9.1%.
How do I check the roofer?
Look the contractor up on the state site and read the bond, either $30,000 or $15,000, and the $250,000 liability insurance. The number on the ad should match the number on the contract.
Should a 20-year-old roof be replaced?
Not by age alone. Twenty years is inside the 15-to-30-year asphalt range on the Forest Service table. Replace it if the field is bald, the deck is soft, or the layer count already hits the city cap. An inspection is the decider.
How long does a roof last in Spokane?
We did not find a Spokane-only figure. A federal table lists asphalt shingles at 15 to 30 years and sheet metal at 20 to 50 years or more. Those are ranges, not a promise. A photo report from one free inspection shows where your roof sits in that range.
Read next
Sources and updates
Built on public data from a Forest Service life table that credits the National Roofing Contractors Association, Spokane's August 19, 2020 roofing application, and the IRS energy-credit FAQ, read November 8, 2026.
Sources (19)
- USDA Forest Service, Building Condition Assessment, Typical Life Expectancy, slide 33: Asphalt and wood shingles 15 to 30 years, asphalt overlay 25 to 35, sheet metal 20 to 50+, tile 50, slate 50 to 100, built-up asphalt 12 to 25. Figures credit the National Roofing Contractors Association (read Nov. 8, 2026).
- City of Spokane, Roofing, Siding, Windows Permit Application, rev. 20200819: Two-layer limit, deck inspection before new roofing, ice barrier, ventilation, 509-625-6300.
- Roofing Contractor magazine, Self-reporting digital roof inspection program: Pilot in July 2023, permanent in October 2023 for residential reroofs. Confirm with the city.
- City of Spokane Valley, Re-Roof Permit Application: Tear-off or overlay, layers, re-sheet, possible structural analysis, owner or registered contractor, 509-720-5240.
- City of Spokane Valley, Snow load amendment: 39 psf ground snow, 30 psf minimum roof snow (read Nov. 8, 2026).
- City of Spokane, Commercial application packet, Mar. 15, 2022: 39 psf ground snow in a commercial packet. House number not verified.
- City of Coeur d'Alene, Building Services FAQ: Roof snow load 40 psf and ground snow load 60 psf (read Nov. 8, 2026).
- FEMA, OpenFEMA Disaster Declarations Summaries: DR-1825, DR-4309, and DR-4593 for Spokane County (read Nov. 8, 2026).
- IRS, Energy credit FAQs: Section 25C not allowed for property placed in service after Dec. 31, 2025.
- Washington State Legislature, WAC 458-20-170: Sales tax measured by the full contract price.
- Washington Department of Revenue, Address rate lookup: Spokane city 9.1% for Oct. 1 through Dec. 31, 2026 (read Nov. 8, 2026).
- City of Spokane, Daily Activity Report example: Clean-set median declared value $12,800 and the 20-to-30-square median $14,000. Metal count too small to use.
- JLC Online / Zonda, 2025 Cost vs. Value, Spokane, WA: Trade study: asphalt replacement job cost $30,552, resale value $19,449, 63.7% recouped (read Nov. 8, 2026).
- Washington State Department of Labor & Industries, Form F625-001-000, rev. 07-2026: Bond and liability amounts.
- Washington State Department of Labor & Industries, Verify a Contractor: Public lookup (read Nov. 8, 2026).
- Washington State Legislature, RCW 18.27.100: Registration number required on ads that show a name or address.
- Washington State Legislature, RCW 48.30A.015: Deductible waivers offered as a practice are unlawful.
- Washington Office of the Insurance Commissioner, Adjuster definition: Pointing at damage is different from explaining coverage.
- Avista, Home insulation rebate: Attic insulation rebate only. No roof rebate listed (read Nov. 8, 2026).
Changelog · 1 update, newest November 8, 2026
- November 8, 2026: First published.
How to cite this page: The Day Company, "Roof replacement in Spokane, WA", updated November 12, 2026, https://theday.company/wa/roofing/spokane/roof-replacement.
Reviewed is the last day a person re-checked every number on this page.
Life ranges are typical figures from an old federal table, not a prediction for your house. The Day Company does not install roofs. We match one local roofer for a free inspection and a photo report. Nothing here is a bid, a tax opinion, or an insurance promise. Sources were read Nov. 8, 2026. Payment for the match is described at how we make money. How calls are handled is on privacy. The Day Company is a free matching service, not a contractor. Before you hire any roofer, check their registration with Washington L&I or the Idaho Contractors Board. We do not answer, record or receive these calls.