NationalFree calculatorBill worksheetPaid partner disclosedReviewed How we verify

What a demand charge is, and a calculator for the kW line

A demand charge follows your highest power use, not just the energy you use all month. The calculator is an estimate, and your tariff sets the real charge.

See my business plansPartner toolFree, no obligation. We may earn a fee if you sign up.
Published 11 min readBy The Day Company review team · How we verify figures
Up to 80%Some Oncor loads over 20 kW: part of an older peak can stay on the bill
15 minutesPG&E example: how Schedule B-19 averages demand above 499 kW
Short answer

A demand charge is the part of the bill that follows your highest power use, in kilowatts (kW). It is not the energy you use all month. A kilowatt-hour (kWh) measures that energy. Type your peak and rate below, then compare business plans.

What do you need right now?
Compare business plans at my ZIP

Partner tool A partner runs the plan finder. If you sign up, it may pay us a fee. We do not take payment to change a score, a rank, the order of our rankings, or what we write about a company. Paid links and partner tools are always labeled as paid.

Up to 80%Some Oncor loads over 20 kW: part of an older peak can stay on the bill
15 minutesPG&E example: how Schedule B-19 averages demand above 499 kW
$0Generation share of PG&E's $37.37-per-kW any-time demand rate (one California example)
01 · Try it

Demand charge calculator

What is your demand charge, and what if your peak were lower?
Type the older peak when you type a ratchet percent.
Your tariff names it. Blank means none.

An estimate from numbers you type. Your bill and tariff decide the real charge.

This is an estimate from the numbers you type. Your bill and your tariff decide the real charge.

The charge in the tool is billed kW times the dollar rate you type. Billed kW is this month's peak, unless a ratchet percent times an older peak is higher. A ratchet is a tariff rule that can keep part of an older peak on the bill. Load factor is your kWh divided by peak kW times 730 hours. The tool uses 730 hours as its stand-in for a month. A lower peak is the change it shows.

A tariff is the utility's official rate rules. A worksheet later on this page is there to print and fill from your bill before you trust the estimate.

The 3 things to know

  • kW and kWh are different. kW is power at a moment. kWh is energy over time. EIA defines a kilowatt as 1,000 watts.
  • One busy interval can set the month. On the Oncor rate below, the monthly peak is the highest 15-minute use.
  • A new supplier may not erase the delivery part of a demand charge. The PG&E and Illinois pages below say what stays.

Built on public data from the U.S. Energy Information Administration glossary, the National Renewable Energy Laboratory survey record on OSTI, Oncor Electric Delivery's tariff for retail delivery service, Pacific Gas and Electric Company Schedule B-19, and the Illinois Commerce Commission choice site.

02 · kW and kWh

What a demand charge is

kW is how hard you draw at one moment. kWh is how much energy you use over time.

Kilowatts (kW)Power

How hard you draw at one moment. The demand charge uses this.

Kilowatt-hours (kWh)Energy

How much you use over time. The energy charge uses this.

EIA says a demand charge is the part of the bill based on your maximum electric capacity use, under the rate schedule. Think of a hose. kW is how wide the hose is open at the strongest moment. kWh is how much water came out all month. You can use a modest amount of water and still get a high demand charge if the hose was wide open for a short time.

EIA also defines load factor as average load divided by peak load over a stated time. A low load factor means the peak was much higher than the typical hour. The calculator shows that ratio with the 730-hour month above. Your tariff may define the month differently.

03 · Bill worksheet

Copy these lines from your bill

Print this table and fill the last column from your bill and your tariff.

Worksheet: copy these from the bill and the tariff
What to copyWhere it usually sitsWhat you do with it
Billed demandA line in kW, often called demand or peakType it as this month's peak kW
Demand rateDollars per kW on the bill or in the tariffType it as the rate
EnergyThe kWh lineType it so the tool can show load factor
Interval lengthThe tariff, not always the billSee the Oncor 15-minute case below. Your utility can differ
RatchetA percent of an older peak, if the tariff has oneType it only when your tariff states the percent and the months

Oncor Electric Delivery's tariff for retail delivery service is the first example here. It is one Texas rate, not a national rule. On Secondary Service Greater Than 10 kW, effective June 1, 2026, the monthly peak (Oncor calls it NCP kW) is the kW supplied during the 15-minute period of highest use in the billing month.

On that same rate, the distribution charge does not always use this month's peak.

Oncor Secondary Service Greater Than 10 kW, effective June 1, 2026. One Texas delivery rate, not a national rule. These rows set the Distribution System Charge only. The sheet's riders use the 80% ratchet in every case.
Older peak in the prior 11 monthsYearly load factorDistribution billing kW on this rate
20 kW or lessanythis month's peak
over 20 kW25% or lessthis month's peak
over 20 kWabove thatthe higher of this month's peak or 80% of that older peak

Seasonal agricultural customers are exempt. The 20 kW and 25% exceptions apply to the distribution charge only. Above 20 kW, yearly load factor also sets the distribution price per kW. Oncor's yearly load factor uses 12 billing months ending in December. That is not the tool's 730-hour figure. Under 90 days of history, Oncor assumes the load factor is over 25%. Oncor calls that an 80% ratchet. Riders NDC, DCRF, RCE, ISR, and MG use the 80% ratchet even when the distribution charge uses this month's peak. Oncor's primary and transmission schedules also use an 80% ratchet on distribution billing demand.

The calculator can do that kind of math. It compares this month's peak with the percent you type times the highest peak in the last 11 months, and it uses the bigger one. The 11-month window is the tool's own rule. Type a percent only when your tariff states one.

PG&E Schedule B-19 is one California example, not a rule. For a customer whose maximum demand exceeds 499 kW, that schedule averages demand over 15-minute intervals. Maximum demand is the highest of those averages in the billing month. If use is intermittent or swings hard, a 5-minute interval may be used. If the customer has welding machines, welder load can set maximum demand when it is higher than the 15-minute average. The sheet that states this took effect September 1, 2022.

04 · One spike

Why the charge gets high

The meter does not bill the typical hour. On the Oncor rate above, it keeps the highest 15-minute use. Two big machines that start together can stack inside that window. The rest of the month can be quiet and the demand charge still uses that window.

  1. Loads overlapTwo machines run in the same measured interval
  2. The interval closesThe tariff keeps the highest average for the month
  3. The bill is setThat kW times the demand rate is the demand charge

A high rate makes the same peak cost more. An August 7, 2017 abstract from the National Renewable Energy Laboratory, on the Department of Energy's OSTI record, estimates that nearly 5 million commercial customers could sign up for tariffs with a demand charge above $15 per kW. It says that is more than a quarter of 18 million commercial customers in the United States. The report ties that level to battery projects and says each site has to be checked on its own. It is not your rate, and it is not a current price.

05 · Example only

A worked example

Every number in this table is made up so the math is easy to check. It is not an Oncor rate, not a PG&E rate, and not your bill.

Made-up example: 100 kW at $20 per kW, not a real bill
LineMade-up numberHow it is figured
This month's peak100 kWA round peak, made up
Demand rate$20 per kWA round rate, made up
Demand charge$2,000100 times 20
Trimmed peak80 kWThe same shop, with a lower peak
Charge after the trim$1,60080 times 20
Difference$400What this example's lower peak changes
Energy14,600 kWhChosen so the next line is a round percent
Load factor at 100 kW20%14,600 divided by (100 times 730)
Made-up example only: demand charge at two peaks
Peak of 100 kW
$2,000
Peak of 80 kW
$1,600

Invented $20 per kW. Not a tariff and not a promise for your meter.

If you also type a ratchet, here is the calculator's rule with more invented numbers. This month's peak is 70 kW. The highest peak in the last 11 months is 120 kW. You type a ratchet of 80 percent. 80 percent of 120 is 96. 96 is bigger than 70, so the tool would bill 96 kW. At the invented $20 rate, that is $1,920. Use this only as a picture of the tool.

06 · What to try

Ways to bring the peak down

These steps aim at the measured peak.

  • Stagger start-ups. EIA says a customer can shift electricity use to another time. Starting big machines at different times can keep two peaks out of the same interval.
  • Move flexible work out of the hours your tariff treats as the peak, if the tariff has peak hours.
  • Pause a load with a control. EIA describes curtailing load, which means turning use down for a while. Try it on a process you can stop.
  • Look at storage with your own numbers. The NREL report says a battery's result has to be checked site by site.
  • The demand charge can remain. A lower peak still gets multiplied by the rate.
  • A control or a battery can be a poor fit if the process cannot stop or the tariff has no demand charge to cut.
07 · Supply and delivery

What a supplier quote leaves out

A new supplier can change your supply price. It may not change much of a demand charge. Check your bill before you count on a saving.

Oncor's demand rates above come from its delivery tariff. A Texas retail supplier does not set that tariff. See our Texas business electricity page for more on that state.

PG&E Schedule B-19 is one California example of a split between supply and delivery. It is not a rule for every state. On that schedule the bill has a demand charge for the peak hours, one for the part-peak hours in summer only, and one for the highest demand at any time. The sheets effective March 1, 2026 split those rates. For secondary voltage in summer, the any-time maximum demand rate is $37.37 per kW. Of that, distribution is $28.24, transmission is $9.10, and reliability services are $0.03. The generation piece of that any-time rate is $0.00 per kW at secondary, primary, and transmission voltage.

The summer peak-period demand rate is different. At secondary voltage it is $46.16 per kW, with a generation piece of $19.46 and a distribution piece of $26.70. A supply contract might touch the generation piece. On this schedule it does not replace the distribution and transmission demand charges.

The billing section effective January 1, 2026 says Direct Access and Community Choice customers who buy supply from a non-utility provider still receive delivery from PG&E. They pay the split rates except the generation charge and the bundled power charge indifference adjustment. They also pay the vintaged power charge indifference adjustment and the franchise fee surcharge. They still pay for supply from that other provider. On this schedule, a new supplier does not wipe out the delivery demand charges.

  • Ask the quote which demand lines are supply and which stay with the utility.
  • On this PG&E schedule, the any-time maximum demand rate has no generation piece.
  • Illinois' official choice site says you pay the same delivery charges whether or not you switch supply. It also says percent-off claims on an Ameren Illinois or ComEd bill refer to the supply part only, not the whole bill.
  • A cents-per-kWh quote can leave the demand charge out. Put the demand lines on the worksheet before you compare.
  • Do not treat this split as the rule in every state. Ask your utility or bidder.

Compare business plans for the supply price. Keep the demand lines the utility still bills. The business electricity rates page is about average cents per kWh, which is not this kW charge. A buying list sits on the energy procurement checklist.

Your next step

Compare business plans for the supply price, and keep the demand lines your utility still bills. Run the calculator on your own peak before you sign.

Compare business plans at my ZIP

Partner tool A partner runs the plan finder. If you sign up, it may pay us a fee. We do not take payment to change a score, a rank, the order of our rankings, or what we write about a company. Paid links and partner tools are always labeled as paid.

Read nextBusiness electricity rates Read it
08 · Quick answers

Questions, answered

What does a demand charge mean?

It is the part of the electric bill that follows your highest power use, in kW, under the rate schedule. EIA defines it that way. kWh is the energy you used over time. The two lines are not the same charge.

Why is my demand charge so high?

A short peak can set the month. Oncor's Secondary Service Greater Than 10 kW rate uses the highest 15-minute use. For some loads on that rate, billing demand is the higher of this month's peak or 80% of the highest peak in the prior 11 months. Oncor's primary and transmission schedules also use an 80% ratchet on distribution billing demand. A high dollar rate per kW makes the peak cost more. A National Renewable Energy Laboratory abstract estimated that nearly 5 million commercial customers could sign up for tariffs with a demand charge above $15 per kW. That figure is not your rate.

How can I reduce or avoid a demand charge?

You can try to lower the peak the tariff measures. Stagger big start-ups, shift flexible loads, pause a load, or study storage. EIA describes shifting use and curtailing load. NREL says a battery has to be checked at the site. The charge may not fall to zero.

Will a new supplier remove my demand charge?

It may not touch the delivery part. On PG&E Schedule B-19, a customer who buys supply elsewhere still pays the delivery demand charges. The any-time maximum demand rate on that schedule has a $0 generation piece, and the summer peak demand rate still has a generation piece. Illinois' choice site says delivery charges stay the same if you switch supply. Compare the supply price, and keep the demand lines the utility still bills.

What should I copy off the bill before I use the calculator?

Copy billed demand in kW, the demand rate in dollars per kW, and the kWh. Then read the tariff for the interval length and for any ratchet percent. The worksheet higher on this page is the list to print.

Is the calculator my real bill?

No. It multiplies the billed kW it computes by the rate you type, and it shows load factor with a 730-hour month. Your bill and your tariff decide the real charge.

HomeSwitchingDemand charge calculator

NationalFree calculatorBill worksheetPaid partner disclosed

Published · 11 min read · By The Day Company review team

Where to next

What do you want to do next?

Sources

Sources and updates

Sources (8)
  • U.S. Energy Information Administration, Glossary: demand charge: A demand charge is the part of the bill based on maximum electric capacity use under the rate schedule. The page shows no date. Read November 5, 2026.
  • U.S. Energy Information Administration, Glossary: demand, demand interval, and demand response: Demand interval is the time period during which flow of electricity is measured. Demand response includes curtailing load and shifting electricity use to another time. The page shows no date. Read November 5, 2026. The 15-minute figures come from the Oncor and PG&E tariffs.
  • U.S. Energy Information Administration, Glossary: kilowatt and kilowatthour: A kilowatt is 1,000 watts. A kilowatthour is 1 kilowatt of power used for 1 hour. The page shows no date. Read November 5, 2026.
  • U.S. Energy Information Administration, Glossary: load factor: Load factor is average load divided by peak load during a specified time interval. The page shows no date. Read November 5, 2026.
  • National Renewable Energy Laboratory (record on OSTI), Identifying Potential Markets for Behind-the-Meter Battery Energy Storage: A Survey of U.S. Demand Charges: Abstract dated August 7, 2017 (report NREL/BR-6A20-68963). Nearly 5 million commercial customers can subscribe to retail tariffs with demand charges above $15 per kW, more than a quarter of 18 million commercial customers. Battery results must be checked case by case. From the abstract. Read November 5, 2026.
  • Oncor Electric Delivery Company LLC, Tariff for Retail Delivery Service, 6.1.1.1.3 Secondary Service Greater Than 10 kW: Sheet 1.3, entire certified service area, effective June 1, 2026, revision twelve. NCP kW is the kW supplied during the 15-minute period of maximum use in the billing month. For the distribution charge, billing kW is this month's NCP kW when the highest NCP kW in the prior 11 months is 20 kW or less, or when that peak is over 20 kW and annual load factor is 25% or less. For all other loads, billing kW is the higher of this month's NCP kW or 80% of the highest monthly NCP kW in the prior 11 months (80% ratchet). The same 80% ratchet applies to riders NDC, DCRF, RCE, ISR, and MG. The 20 kW and 25% exceptions apply to the distribution charge only. Above 20 kW, yearly load factor also sets the distribution price per kW. That yearly figure uses 12 billing months ending in December, not a 730-hour month. Under 90 days of history, the load factor is assumed over 25%. Primary and transmission schedules also use the 80% ratchet on distribution billing demand; primary has the same 20 kW exception, and transmission shows none. The 80% ratchet and the annual load factor provisions do not apply to retail seasonal agricultural customers. Read November 5, 2026.
  • Pacific Gas and Electric Company, Electric Schedule B-19, Medium General Demand-Metered TOU Service: 15-minute demand averaging when maximum demand exceeds 499 kW, on the sheet effective September 1, 2022. A 5-minute interval may be used if use is intermittent or swings hard. Welder load can set maximum demand when it is higher than the 15-minute average. Three demand charges on the bill. The part-peak demand charge is summer only. March 1, 2026 rates and the generation, distribution, and transmission split (Advice 7846-E), including secondary summer any-time demand of $37.37 per kW ($0.00 generation) and peak-period demand of $46.16 per kW. Direct Access and Community Choice billing, sheet effective January 1, 2026. Those customers also pay the vintaged power charge indifference adjustment and the franchise fee surcharge. One California example, not a rule for every state. Read November 5, 2026.
  • Illinois Commerce Commission, Plug In Illinois, Electric Choice Basics: Delivery charges stay the same if you switch supply. Percent-off statements refer to the electric supply portion of an Ameren Illinois or ComEd bill only, not the total bill. The page showed no date. Read November 5, 2026.
Changelog · 2 updates, newest November 14, 2026
  • November 14, 2026: Added a link to the Massachusetts business page.
  • November 5, 2026: Guide published.

How to cite this page: The Day Company, "What a demand charge is, and a calculator for the kW line", updated November 14, 2026, https://theday.company/switch/demand-charge-calculator.

Reviewed is the last day a person re-checked every number on this page.

The Day Company is not a utility, a supplier, a regulator, or a law firm. The calculator is an estimate from numbers you type. The NREL figures are not a current price. The made-up $20 example is not a tariff. Pages with no date may have changed. This is general information, not legal advice. Read your bill and your tariff before you sign. If a fact here is wrong, email info@theday.company. Our plan finder is Power HQ, operated by Blitz Ventures Inc. (doing business as EnergyBot).