Metal roofing in Spokane, WA

Metal is on a longer life range than asphalt shingles in a federal table. Spokane's own permits are too few to price it. Snow can slide, and the city still has rules for the eave and the layers.

Get my free roof inspection
20 to 50+ yearsSheet metal on the USDA life table
15 to 30 yearsAsphalt shingles on that same table
Short answer

Sheet metal sits at 20 to 50 or more years on a federal life table. Asphalt shingles on that same table sit at 15 to 30 years. Spokane logged only 6 metal house reroofs in the permit set we counted, which is too few to print a metal price. Snow can leave a slick roof in a sheet. Ask about guards over doors. We did not find a city rule that requires them. Get one free inspection before you order panels.

The 4 things to know

  • A longer life range is not a bid. The table is old and labeled typical. Your quote is a different document.
  • Do not borrow a national metal price. The only local dollar file we trust did not have enough metal jobs.
  • Metal does not cancel ice dams. Dams are a heat problem. A slick surface changes how snow leaves. It does not seal the attic.
  • One roofer looks, then you decide. The photo report is how you test any metal price you already collected.
01 · Compare

Metal beside shingles

The life ranges come from a Forest Service slide used for building-condition work. The year figures on that slide are credited to the National Roofing Contractors Association. Treat the years as typical ranges, not a warranty.

What we can say, and what we will not invent
TopicAsphalt shinglesSheet metal
Typical life on the USDA slide15 to 30 years20 to 50 or more years
Asphalt overlay on that slide25 to 35 yearsNot a metal line
Spokane house permits we could priceClean set, middle declared value $12,8006 permits only. No metal median
City layer capFinished roof may not exceed 2 layersSame form. It does not write a metal exception
Ice at the eaveBarrier to 24 inches inside the wall on a reroofSame form. We will not say metal skips it
Noise in rain or hail classNot in our sourcesNot in our sources

An overlay means new shingles on top of old ones. The city form still stops the finished roof at two layers. If two layers are already up, they come off, metal or not. The wood deck is inspected before the new roof. Attic ventilation has to be adequate.

We do not name panel brands, and we do not rank installers. A color chart is a manufacturer's sales sheet. It is not a Spokane price.

How asphalt jobs show up in the permit medians, by size, is the roof replacement cost page. Read those dollars as shingle-side declared values. They are not a metal quote with the word metal swapped in.

02 · Cost

Why there is no metal roof cost here

The city prints a weekly activity report with the job value declared on the permit. We kept house reroofs. Metal appeared six times. That is too small to publish a median, a per-square figure, or a range. Anyone who prints a tight Spokane metal price is not using this file.

For scale only, the cleaned shingle-side set (10 to 80 squares, not partial, not metal, declared value at least $1,000) has 2,977 permits. The middle declared value is $12,800. The central band of those permits, from the 25th to the 75th, is $9,000 to $17,500. A square is 100 square feet of roof. Declared means typed on the form. It is not an invoice. Metal can cost more up front and last longer. This file cannot show you the gap in dollars.

Cleaned house reroofs by size, declared value, not a metal price
10 to 20 squares
$9,950
20 to 30 squares
$14,000
30 to 40 squares
$19,284

City of Spokane permit reports, February 2024 through March 2026. Metal jobs were pulled out of this clean set. The highlighted bar is the common 20-to-30-square band. Use it to spot a wild quote, not to budget standing-seam panels.

Sales tax is separate from that permit number. For October 1 through December 31, 2026, a Spokane city address is 9.1% and Spokane Valley is 9.0%. WAC 458-20-170 says a contractor generally charges retail sales tax on the full contract, labor and materials. The text we read does not say "metal roof," so confirm a strange quote with the Department of Revenue.

A 2026 city fee schedule prices the building permit from the job value declared on the permit. From $2,001 to $25,000, the fee is $73 plus $13 per $1,000, or fraction, over $2,000. There is also a $65 processing fee and a 2.5% technology fee. The schedule has no line named "metal roof." On a job declared at $12,800, the building piece is $216 and processing adds $65. Whether the 2.5% applies only to that $281 is not spelled out, so say about $290 before any plan-review add-on. Plan review on a plain reroof was not confirmed.

A metal quote that subtracts a 2026 roof tax credit is using a credit that ended. The cutoff and the other paper dates are below.

  1. Aug. 19, 2020Date on the city roofing form. Confirm it is still the one at the counter.
  2. Oct. 2023A trade magazine said the city photo path for house reroofs became permanent. Confirm it is still open.
  3. Dec. 31, 2025IRS: section 25C is not allowed for property placed in service after this day.
  4. Oct. 1 to Dec. 31, 2026Sales tax is 9.1% in the city and 9.0% in the Valley.
03 · Sliding

Snow on a slick roof

A psf is one pound of load on a square foot of surface. Do not stamp the commercial 39 on a house until Development Services confirms it at 509-625-6300. The city house line would not open.

Snow and wind facts we could read
ItemWhat the source says
Valley ground snow39 psf
Valley least roof snow30 psf
City commercial packet39 psf on the ground, dated March 15, 2022
Snow guardsNo city rule found that requires them
Airport gust71 mph on November 17, 2015

A metal surface can let snow release in a slab. Ask, in writing, what happens over a door, a walk, a deck, and a lower roof. We also found no maker install sheet to quote. Ask the roofer what they specify, and where. "Guards everywhere" and "guards nowhere" are both incomplete answers.

Do not accept "metal stops ice dams." An ice dam is a ridge of ice at the eave that blocks meltwater. University of Minnesota Extension says it needs snow on the roof, an upper surface above 32°F, and a lower surface below 32°F. Heat from the house is the main cause. The Building America notes say air sealing, soffit-to-ridge airflow, and attic insulation make dams unlikely. Those steps are about heat, not about the panel.

The winter checks, the Avista attic rebate, and the Valley code section are on the winter roof prep page.

Wind is the other local test. The airport recorded a 71 mph gust on November 17, 2015. Fasteners and the edge detail belong in the quote. We will not invent a wind rating for "metal" as a category. Ask which assembly is being sold, and what test the maker publishes for that assembly. If the answer is a slogan, it is not a spec.

04 · City steps

Permits and the two inspections

Inside Spokane, roofing that the city form covers needs that permit path. The form date is August 19, 2020, so confirm it is still the one the counter uses.

  1. PermitTear-off or overlay, and the job value you declare.
  2. Deck lookRequired before the new roof goes on.
  3. Ice barrierFrom the eave to at least 24 inches inside the outside wall.
  4. VentsAttic ventilation has to be adequate.
  5. FinalThe city looks again when the roof is on.

A city roofing guide, read as a public snippet on November 8, 2026, says the minimum is two inspections and lists a $75 fee to re-inspect. Confirm both with Development Services before you count on the dollar. The guide file has been thin when opened another way, so the $75 is a check-with-the-city figure, not a bill we calculated.

A trade magazine reported that Spokane made a photo-and-video inspection path permanent in October 2023 for residential reroofs. The contractor sends the pictures. The city still does a deck check and a final check, in that account, only remotely. Confirm the path is still open. It is about permitted house reroofs, not a reason to skip the permit.

Spokane Valley uses its own re-roof application. It asks tear-off or overlay, how many layers are up, and whether the deck will be re-sheeted. It says a structural look may be required. The person who files must be the owner or a contractor who is registered under chapter 18.27 RCW. Permit center: 509-720-5240.

The steps of a full replacement, including when metal is the wrong conversation because the deck is rotten, are on the roof replacement page.

05 · The list

What to ask before panels are ordered

Take this list to the visit. A price without these lines is a color sample, not a contract.

  • How many layers come off, and who hauls them.
  • What happens, at what unit price, if the deck is soft.
  • Whether the quote includes the ice barrier, new flashing, and the pipe boots.
  • Where snow is expected to land, and what hardware is in the price over doors and walks.
  • Whether anyone checked the frame for the snow load that applies to this address.
  • The panel thickness and the fastener pattern, in the maker's words, not a nickname.
  • Who warranties the finish, who warranties the workmanship, and for how long, in writing.
  • Tax at 9.1% in the city (through December 31, 2026) as its own line.
  • The registration number from L&I (the state agency that registers contractors), matching the ad and the contract.
  • A claim that insurance "prefers metal" or will drop your rate. Ask your insurer. We have no Spokane discount to cite.
  • A 2026 federal tax credit subtracted from the bid.

Flashing is the metal that keeps a joint dry. A pipe boot is the collar on a vent. Workmanship is the installer's promise about the labor. The maker's promise is about the panel. They are not the same piece of paper.

The registration form revised in July 2026 lists two bond levels: $30,000 if the firm is a general contractor, $15,000 if it is specialty. The liability line on that form is $250,000 per occurrence. L&I must be the certificate holder. The form never says which bond a roofer must pick. Search Verify a Contractor and read the record that opens.

How to read those two warranties, and what to refuse in a contract, is on how to choose a roofer.

The match is one local roofer and one free inspection. You keep the photo report and use it to check any other metal price. We do not sell panels and we do not install them.

Free for you. The roofing company pays us a flat monthly fee. The Day Company is a free matching service, not a contractor. Before you hire any roofer, check their registration with Washington L&I or the Idaho Contractors Board. We do not answer, record or receive these calls.

06 · Next step

One look before the panels

Order panels after someone has seen the boards. A metal price that assumes a clean deck falls apart when the plywood is black. The free inspection from one matched roofer is that look. You keep the photo report. Set it beside any other metal number. There is no stack of bids from us, and there is no panel brand we push.

If the report shows two layers already, the city form says they come off before new roofing goes on. If it shows a soft deck, price the wood first. If it shows a hot attic and ice at the eaves every year, fix the heat path before you blame the old shingles. Those three findings change the metal conversation more than the color chart does.

Your next step

Want metal on this house? Get one free inspection first. The photo report shows the deck and the layers before you judge any price.

Read nextWhat Spokane permit values say a reroof costs Read it
07 · Quick answers

Questions, answered

Is a metal roof worth it in Spokane?

The federal life table gives sheet metal 20 to 50 or more years and asphalt shingles 15 to 30. That is the sourced gap. We cannot price the gap locally: only 6 metal house reroofs were in the permit set. Worth it depends on the quote, the deck, and how long you will keep the house.

How much does metal roofing cost in Spokane?

We will not print a number. Six permits are too few. The $12,800 middle declared value is for cleaned house reroofs that were not metal. Ask for a written scope and put sales tax on its own line.

Do I need snow guards?

We did not find a city rule that requires them. Snow can slide off a slick roof, so ask what protects doors, walks, and lower roofs, and get that hardware in the price if you want it. Guards are not a cure for ice dams.

Does metal cause ice dams, or stop them?

Neither claim is supported here. Ice dams come from heat loss: a warm upper roof and a freezing eave, with snow on top. Air sealing, ventilation, and attic insulation are the prevention steps in the Building America notes.

Do I need a permit for a metal roof?

A reroof in the city follows the roofing permit form: two layers maximum, a deck inspection, attic ventilation, and an ice barrier to 24 inches inside the wall. Spokane Valley has its own application. Call 509-625-6300 in the city or 509-720-5240 in the Valley and describe the job.

Is steel roofing the same as a metal roof?

Steel is one metal roofing material. The Department of Energy's Building America guide lists steel, aluminum and copper as the most common ones. Panels come in two types: exposed fastener and standing seam. Ask which metal and which panel type your quote uses.

Will a metal roof change my insurance?

Ask your insurer. Nothing on this page says a metal roof is covered differently or costs less to insure.

Next steps

Read next

Sources

Sources and updates

Metal prices from national price websites are not used on this page. Six city permits are not a market. If a quote cites a national range, ask for the Spokane scope instead.

Built on public data from the USDA Forest Service life table (figures credited to the National Roofing Contractors Association), City of Spokane house-reroof permits from February 2024 through March 2026, and the August 19, 2020 city roofing form.

Sources (19)
Changelog · 1 update, newest November 8, 2026
  • November 8, 2026: First published.
Published 11 min readBy The Day Company review teamReviewed

How to cite this page: The Day Company, "Metal roofing in Spokane, WA", updated November 12, 2026, https://theday.company/wa/roofing/spokane/metal-roofing.

Reviewed is the last day a person re-checked every number on this page.

No metal install price is stated, because six permits cannot support one. Life years are typical ranges from an old federal slide, not a warranty. The Day Company matches one local roofer for a free inspection and a photo report. We do not install metal roofs. See how we make money and privacy. The Day Company is a free matching service, not a contractor. Before you hire any roofer, check their registration with Washington L&I or the Idaho Contractors Board. We do not answer, record or receive these calls.