Signs the roof needs a repair
Stay on the ground or in the attic. A fall is worse than a slow leak. Walk the rooms first, then the outside, then the attic if the hatch is safe and floored.
- Brown rings on a ceiling, or paint that bubbles along an outside wall, after rain or a thaw.
- Shingle tabs in the yard or in a downspout after wind. A few tabs can be a patch. A whole slope of bare spots is a different talk.
- Daylight in the attic where a vent, a chimney, or a wall meets the roof. That joint is flashing. Flashing is the metal that is supposed to keep that joint dry.
- A ridge of ice along the gutter in a cold snap, with a drip inside a few days later.
- Grit from shingles in the gutters, if the roof is already in the later part of its life.
- A sagging line in the roof or a soft feel reported by someone who was up there. Stop patching and get the deck looked at.
- Moss by itself is not proof the roof is done. It does hold water. Ask whether the quote is cleaning, or new material.
An ice dam is that ridge of ice at the edge. Meltwater backs up behind it and slips under the shingles. University of Minnesota Extension describes the setup: snow on the roof, the upper surface warmer than 32 degrees, and the lower surface colder than 32. Heat leaking from the rooms is the usual driver. A patch at the stain does not stop the heat leak.
The U.S. Department of Energy's Building America notes, written at Pacific Northwest National Laboratory, say ice dams get rare when the ceiling is air-sealed, air can move from the soffit to the ridge through baffles, and the attic has a lot of insulation. A baffle is a chute that keeps insulation from choking the intake at the eave. Dams also show up in valleys and around chimneys. If the repair quote ignores the attic, ask why.
- Keep room heat out of the attic by sealing ceiling leaks, then add insulation.
- Leave a path from the soffit vents to the ridge. Baffles hold insulation back from that path.
- If the eave is rebuilt, Spokane's seal must reach 24 inches inside the outside wall.
- Do not stuff insulation into the soffit vents. A blocked intake can feed the next ice ridge.
Patch, spot repair, or a new roof
We do not have a city table of patch prices, so this page will not invent "the average Spokane repair." What we do have is the scale of a full house reroof. On the clean set of city permits (10 to 80 squares, not a partial job, not metal, value of at least $1,000), the middle declared job value is $12,800. A square is 100 square feet of roof. There were 2,977 of those permits. Declared means the number written on the permit, not a check the owner wrote.
Use that only as a yardstick. A true spot repair should sit far under it. If a "repair" price is climbing toward the $9,000 to $17,500 band (the middle half of those full reroofs), ask whether you are buying a patch or a new roof with a softer name.
| What you see | A sensible next question | Usually points toward |
|---|---|---|
| A handful of missing tabs after one windy day | Can the same shingles still be bought? | A spot repair, if the deck is dry |
| One leak at a chimney or a wall | Will the flashing be rebuilt, or only gooped? | A flashing repair, photos before and after |
| Ice at the eaves every winter | Is the attic air-sealed, or only the shingles? | Edge work plus attic work |
| Two layers already on the roof | Will this add a third layer? | Tear-off. The city form does not allow three. |
| Soft deck or a sag | Who looks at the boards before shingles go back? | Stop. Price a deck repair, not a patch. |
| Leaks in several rooms | Is the wear across the field, not one hole? | Talk about replacement, then confirm on site |
Granules are the grit pressed into an asphalt shingle. When that grit is gone across a whole slope, a few new shingles will not put the roof back. Our replacement guide walks through age and tear-off. The inspection page lists what the photos should cover.
A tarp is mitigation, not the finished repair. The insurer has 5 business days to approve that scope or send it back with dollar lines.
Layers, flashing, and the eave seal, after someone has seen the wood.
What changes a repair price
Pitch, access, layers, and rotten wood move the hours. We will not paste a percent "emergency fee" onto that, because no primary source we trust gives a Spokane after-hours rate. Anyone who quotes a rush charge should write the dollars, the hours, and what the temporary cover includes.
| Line on the quote | What it changes | Question to ask |
|---|---|---|
| Area | A chimney chase is not a whole slope | "How many squares, or how many feet of edge?" |
| Deck | Soft plywood means new boards before shingles | "What happens if the wood is wet when you open it?" |
| Layers | One layer can sometimes stay. Two must come off. | "How many layers are up today?" |
| Edges | Ice-barrier material and new flashing cost more than tabs | "Does this include the eave seal and the step flashing?" |
| Height and pitch | Steeper roofs take more time and more anchors | "What safety gear is in this price?" |
| Cover and haul-off | A tarp, a dumpster, and old shingles are real costs | "Is the temporary cover in the price or extra?" |
| Tax | Washington generally taxes the full contract | "Is the 9.1% city tax inside this number?" |
| Permit | Some roof-covering work needs one. Small patches are not settled in the form we read. | "Will you pull a permit, and what is the fee?" |
City sales tax on a Spokane address is 9.1% from October 1 through December 31, 2026. The tax is generally on the whole contract, labor and materials together. Spokane Valley is 9.0% for the same quarter. A repair quote that hides tax will look cheaper until the bill.
The federal index that tracks what shingle plants charge stood at 255.2 in January 2020 and at 370.4 in September 2026. The rise is about 45%. Your patch may use one bundle, so the index is not your invoice. It does explain why a shingle that was cheap a few years ago is not the same bundle now. The index dipped from 377.3 in August 2026 to 370.4 in September. Installed prices do not have to follow that dip in the same month.
The 2026 city fee schedule is a building fee by declared job value, plus a $65 processing fee, plus a 2.5% technology fee. On a full reroof declared at $12,800, the building fee works out to $216 and processing adds $65. Whether a tiny repair even needs that permit is not written on the form. Call 509-625-6300 and describe the work. The fee math for a full reroof is on the cost page.
City and Valley rules that touch a repair
If new roofing goes on, the August 19, 2020 city form still applies. Total layers may not exceed two. With two or more layers already installed, all of them come off. The wood deck is inspected before the new roofing. Attic ventilation has to be adequate. The ice barrier runs from the eave edge to at least 24 inches inside the exterior wall line. The form allows that barrier as two layers of cemented underlayment, or as a self-sticking modified-bitumen sheet. Underlayment is the water-shedding layer under the shingles. Modified bitumen here means a sticky sheet made to seal to itself.
We could not find a city sentence that says "repairs under X square feet are exempt." Do not trust a blog that picks 1 square or 25% of the roof. Describe the job to Development Services, 808 W Spokane Falls Blvd, 509-625-6300. Inside Spokane Valley, the re-roof application asks tear-off versus overlay, the layer count, and whether the deck will be re-sheeted. Permit center: 509-720-5240. The applicant is a contractor registered under chapter 18.27 RCW, or the owner.
A 2023 trade article said Spokane kept a photo-and-video inspection path for residential reroofs, made permanent in October 2023. That is about permitted reroofs, not about a three-shingle patch. Confirm it before you assume the city will accept pictures in place of a site visit.
Ventilation is on the form because a hot attic melts snow from above while the eave stays frozen. A repair that blocks soffit vents to "keep wind out" can make the next ice dam worse. Soffits are the flat underside of the overhang.
Storm damage, claims, and the deductible
Sudden wind damage and slow wear are not the same story, and we did not find one Washington statute that sorts a repair for you. Ask your insurer. What the state does write down is the clock and a few hard limits.
- AcknowledgementWithin 10 business days the insurer must acknowledge the claim.
- InvestigationWithin 30 calendar days, unless it reasonably cannot be finished.
- Yes or noWithin 30 calendar days of notice, accept or deny, or send a written delay and repeat it every 30 days.
- Emergency dry-inApprove or send back a mitigation scope within 5 business days. A rejection needs a dollar-by-dollar note.
Mitigation means work that stops more damage, such as a tarp or a temporary dry-in. It is not the final repair. Since October 18, 2026, a denial also may not rest only on a database or on estimating software. You can ask to see the claim file. One access deadline we saw only in a law-firm summary, so we are not quoting that number.
- You pick the contractor. The insurer does not assign you one.
- When the insurer builds actual cash value, the used value, it may age the materials. It may not take a cut for the labor. Depreciation means that age cut.
- If you have replacement-cost coverage, the insurer can pay the used value first and the rest when the work is actually done.
- A photo report is a packet you can send. You can send the photo report to your insurer yourself. In Washington, a contractor may point at damage when an adjuster visits, but only a licensed adjuster may negotiate how the policy pays.
- Do not sign an assignment of benefits you do not understand. That paper can let a company collect from the insurer.
- A contractor who regularly offers to waive, rebate, or pay your deductible is breaking RCW 48.30A.015. Walk away.
- Coverage talk is adjuster work. A roofer may price the damage. A roofer may not tell you how the policy must settle unless that person holds an adjuster license.
The November 17, 2015 gust at the airport was 71 mph. FEMA's DR-4249 lists severe storms and straight-line winds for this county, incident date November 12, 2015, declared January 15, 2016. Those are two public records of the same season, not a promise about your shingles. Large hail is the rare event: four days at 1 inch or more from 2016 through October 2026. If someone says hail "always" totals Spokane roofs, the storm file does not back that up.
NOAA county records, January 2016 through October 2026. Wind is the usual repair trigger. The four large-hail days are in August 2022 and on July 10, 2023.
Claim steps in more detail are on the storm damage page. An active drip is on the leak page.
RCW 48.18.200 says a property policy has to leave you at least one year after the loss before it can block a lawsuit. Your policy may allow more time. Do not treat these lines as advice for your claim. Call the insurance consumer line at 800-562-6900 if the clock stalls.
Free for you. The roofing company pays us a flat monthly fee. The Day Company is a free matching service, not a contractor. Before you hire any roofer, check their registration with Washington L&I or the Idaho Contractors Board. We do not answer, record or receive these calls.
Who should do the repair
- Photograph the roomPut the date in the picture. Leave the shingles alone.
- Scan from the yardLook for missing tabs, a dipped edge, or ice in the gutter.
- Ask if this is a reroofCity desk 509-625-6300. The form does not give a small-patch exemption.
- Book one visitOne roofer, photos, then a written scope if you want the work done.
Ask for a contractor registered with Washington L&I. On the registration form revised in July 2026, the bond is $30,000 for a general contractor and $15,000 for a specialty contractor. Liability insurance on that form is $50,000 property damage plus $200,000 bodily injury, listed as $250,000 per occurrence. Per occurrence means per event. L&I must be the certificate holder. We could not see a rule that forces roofers into one of the two bond boxes. Look up the person and read which bond is on the record.
The lookup is Verify a Contractor. Search by name, registration number, workers' comp account, or UBI. The UBI is the state business number. The results page does not publish a menu of fields in advance. Read whatever record opens, and still ask for the certificate.
Ads that show a contractor's name or address must show the L&I number. If the magnet on a truck has a name and no number, that ad is out of step with RCW 18.27.100 (the state law on contractor ads).
The Day Company does not repair roofs. The number on this page rings one local roofing company directly for a free inspection. You get a photo report. Lay that packet next to a price you picked up somewhere else. Hiring remains your choice. Questions to take to that visit are collected on how to choose a roofer. The citywide starting point is the Spokane roofing page.
Get one free inspection from a matched local roofer and keep the photo report so you can check any other repair price.
Questions, answered
How much is roof repair in Spokane?
No city record lists patch prices, so we will not quote an average. A full house reroof in the clean permit set has a middle declared value of $12,800, with the middle half from $9,000 to $17,500. A real spot repair should be well under that band. Get the area and the deck condition in writing.
Do I need a permit for a roof repair?
The city form covers roof-covering work, but it does not state a minimum size. Call 509-625-6300 and describe the repair. In Spokane Valley, call 509-720-5240. A blog figure of "1 square or 25%" is not on the city form we read.
Can I put new shingles over the old ones?
Only if the finished roof still has no more than two layers. Two layers already in place have to come off. Count the layers at a rake edge or in the attic before you agree to an overlay. The rake is the sloped edge along the gable.
Does insurance pay for roof repair?
Ask the insurer. Policies split sudden damage from wear, and we did not find a state rule that decides your roof. You do get a clock: acknowledgement in 10 business days, and a yes or no in 30 calendar days, under the rules in effect since October 18, 2026.
How fast must the insurer look at the roof?
The investigation is due within 30 calendar days of notice unless it reasonably cannot be done that fast. A mitigation scope, such as a tarp, is on a shorter clock: 5 business days to approve it or send it back with a dollar itemization.
Who should I hire for a Spokane repair?
A contractor you can find on the L&I lookup, with either the $30,000 or the $15,000 bond and $250,000 of liability insurance per occurrence. Get one free inspection and a photo report rather than a pile of unnamed bids.
Will insurance cover a 10-year-old roof?
Age alone is not a yes or no in the state rules we read. Ask how your policy treats actual cash value and replacement cost. Actual cash value is the used value, and Washington does not let the insurer depreciate labor in that math. Replacement-cost policies can hold back money until the work is done.
Is it an emergency repair?
Treat it as urgent when water is entering a room or the ceiling is sagging. A dry stain can wait for a scheduled visit. Take photos first. The first-hour steps are on our roof leak repair page.
Read next
Sources and updates
Built on public data from Spokane's roofing application dated August 19, 2020, Washington claim rules amended October 18, 2026, and declared reroof values from city activity reports, read November 8, 2026.
Sources (24)
- City of Spokane, Roofing, Siding, Windows Permit Application, rev. 20200819: Two-layer cap, tear-off, deck inspection, ventilation, ice barrier to 24 inches inside the wall, and 509-625-6300.
- City of Spokane Valley, Re-Roof Permit Application: Layer count, tear-off or overlay, re-sheet, possible structural analysis, owner or registered contractor, 509-720-5240 (file dated Feb. 2025).
- University of Minnesota Extension, Dealing with and preventing ice dams (reviewed 2022): Ice dam definition and the temperature split that forms one (read Nov. 8, 2026).
- U.S. Department of Energy, Building America Solution Center (PNNL), Construct roofs and attics for ice dam prevention (updated Dec. 6, 2022): Air sealing, soffit-to-ridge airflow, baffles, and attic insulation.
- City of Spokane, Daily Activity Report, example Feb. 2, 2025: Declared values for house reroofs. Clean-set median $12,800 and the $9,000 to $17,500 middle half.
- Washington Department of Revenue, Address rate lookup: City 9.1% and Spokane Valley 9.0%, Oct. 1 through Dec. 31, 2026 (read Nov. 8, 2026).
- Washington State Legislature, WAC 458-20-170: Sales tax on the full contract price for construction charged to consumers.
- Federal Reserve Bank of St. Louis, Producer Price Index PCU324122324122: Asphalt shingle and coating maker prices, Jan. 2020 through Sep. 2026 (read Nov. 8, 2026).
- City of Spokane, Development Fee Schedule 2026: $65 processing fee, 2.5% technology fee, and the job-value building fee used for the $216 example.
- Washington State Legislature, WAC 284-30-360: Acknowledge a claim within 10 business days (rules effective Oct. 18, 2026).
- Washington State Legislature, WAC 284-30-370: Investigation within 30 calendar days unless it reasonably cannot be done.
- Washington State Legislature, WAC 284-30-380: Accept or deny within 30 calendar days of notice.
- Washington State Legislature, WAC 284-30-330: No denial based only on a database, and a 5-business-day mitigation decision with a dollar itemization.
- Washington Office of the Insurance Commissioner, Filing a homeowner insurance claim: No labor depreciation on actual cash value, choice of contractor, replacement-cost holdback, assignment-of-benefits caution, 800-562-6900 (read Nov. 8, 2026).
- Washington State Legislature, RCW 48.30A.015: Regularly waiving or paying a deductible is unlawful.
- Washington Office of the Insurance Commissioner, Adjuster definition: Estimating damage is allowed. Settling how the policy pays needs an adjuster license.
- Washington State Legislature, RCW 48.18.200: Suit limit in a property policy may not be shorter than one year from the loss.
- National Weather Service, Historic November 2015 windstorm: 71 mph gust at Spokane airport, Nov. 17, 2015.
- FEMA, OpenFEMA Disaster Declarations Summaries: DR-4249, incident Nov. 12, 2015, declared Jan. 15, 2016.
- NOAA National Centers for Environmental Information, Storm Events bulk files: Four hail events of 1 inch or larger in Spokane County, 2016 through Oct. 2026.
- Washington State Department of Labor & Industries, Contractor registration form F625-001-000, rev. 07-2026: Bond and insurance amounts.
- Washington State Department of Labor & Industries, Verify a Contractor: How to look up a contractor (read Nov. 8, 2026).
- Washington State Legislature, RCW 18.27.100: Registration number on ads that show a name or address.
- Roofing Contractor magazine, Self-reporting digital roof inspection program: October 2023 photo and video path for house reroofs. Trade press, confirm with the city.
Changelog · 1 update, newest November 8, 2026
- November 8, 2026: First published.
How to cite this page: The Day Company, "Roof repair in Spokane, WA", updated November 12, 2026, https://theday.company/wa/roofing/spokane/roof-repair.
Reviewed is the last day a person re-checked every number on this page.
A repair price on this page is not offered, because the city does not publish one. The $12,800 figure is a declared permit value for full house reroofs, useful only as scale. A roofer in the network does the looking. We do not patch roofs or talk to your insurer for you. Rates and rules were read Nov. 8, 2026. See how we make money and privacy. The Day Company is a free matching service, not a contractor. Before you hire any roofer, check their registration with Washington L&I or the Idaho Contractors Board. We do not answer, record or receive these calls.