The names on a flat roof
Low-slope means water leaves slowly. Ponding is water that sits. We did not find a Spokane code sentence that defines how long water may sit, so the practical step is to photograph standing water a couple of days after rain and ask the roofer what it means for this deck.
| Name | In plain words | Life we can cite | Ask this |
|---|---|---|---|
| TPO | A plastic sheet roof. The letters stand for thermoplastic polyolefin. | Not in the table we used | How are the seams made, and what thickness is specified? |
| PVC | Another plastic sheet. The letters stand for polyvinyl chloride. | Not in the table we used | Same seam and thickness questions, plus what touches the sheet that could stain it |
| EPDM | A rubber sheet. The letters stand for a synthetic rubber compound. | Not in the table we used | How patches and seams are made, and how old the sheet is now |
| Built-up | Layers of asphalt and felts, the older "tar and gravel" family | 12 to 25 years | How many plies, and is the insulation wet? |
| Coating | A liquid layer over a roof that is already there | Not cited here | What fails if the coating goes on wet insulation? |
| Sheet metal | Metal panels or a metal low-slope system | 20 to 50 or more years | Which assembly, and where does snow slide? |
Those year ranges are typical figures on a Forest Service slide. The slide names the National Roofing Contractors Association as the source of those year ranges. The table is old. It is not a warranty, and it is not a Spokane bid.
A coating is not automatically a new roof. Marketing lines that promise a spray will "bring a roof back" are not repeated here. If the insulation under the sheet is wet, a coating on top does not dry it. Ask for a moisture check in the proposal, in words, before you pay for a liquid layer.
House shingles and standing-seam questions that belong on a home are on the metal roofing page. Do not copy a house metal price onto a warehouse. We do not have a house metal price either. Six metal house permits were too few to publish.
Snow, wind, and a roof that barely tilts
A steep house sheds snow toward the yard. A flat roof holds it until drains, sun, or a crew move it. The design number is still a structural number, not a weather forecast.
For a commercial job inside the city, the application packet dated March 15, 2022 lists a ground snow load of 39 psf. Psf is pounds pressing on one square foot. That packet is not a promise about every address in the county. Spokane Valley's house code lists 39 psf on the ground and a 30 psf minimum on the roof. Use the code that matches the parcel. Call the city at 509-625-6300 if the plan reviewer and the packet disagree.
Hail is not the common event in this county file. The dates and counts we can cite are below. A commercial policy is its own contract. Read that policy's notice deadline. Do not assume the homeowner calendar is your calendar. Claim steps for a house policy are on the storm damage page.
- Dec. 2008FEMA DR-1825. Record snow for this county.
- Nov. 12, 2015FEMA DR-4249 storm period begins. Severe storms and straight-line winds.
- Nov. 17, 201571 mph gust at the airport.
- Jan. 2016 to Oct. 2026NOAA: 32 wind reports of 58 mph or more. Only 4 hail days at 1 inch or larger.
We did not confirm a Washington energy-code R-value for commercial roof insulation. R-value is the insulation score. Ask the city which code year applies to a recover or a tear-off before someone prints an R-number on a proposal.
Patch, coat, or tear off
Age alone is a weak verdict when we cannot cite a life for the sheet that is up there. Use what you can see.
- Leaks at one curb or one pipe can be a patch if the field is dry and the sheet still has life left, in the maker's terms.
- Soft spots underfoot, or a musty smell in a top-floor ceiling, point at wet insulation. Price the dry-out, not only the patch.
- Standing water over a drain two days after a gentle rain means the drain or the slope is the job.
- Blisters, open seams, and shrinking flashings are field problems. Flashing is the material that keeps an edge or a joint dry.
- A coating proposal should say what it will not fix. Wet insulation and a rotten deck are outside a paint-like layer.
- Do not coat a roof because a flyer called coating a "replacement alternative." That slogan is marketing.
- Do not tear off a whole roof because one drain clogged, until someone shows the wet area on a map.
- Map the leaksMark rooms, drains, and the date of each drip. Photos from inside and from a safe edge.
- MoistureAsk for a way to find wet insulation before you buy a new sheet.
- ChoicePatch, coat, recover, or tear off. Each word should match a written area.
- PaperPermit path, tax, and who pulls the permit, before the dumpster.
- After the next rainWalk the same rooms. A second leak means the map was wrong.
Recover means a new layer over a dry old one, when the code and the deck allow it. Tear-off means the old system comes off. Those words get misused in bids. Make the bid pick one.
If the building is really a house with a low porch roof, the layer cap and the ice-barrier rules for houses are on the roof replacement page. Do not stretch the house form across a store without asking the permit desk.
Permits, tax, and the fee we will not invent
The 2026 city fee schedule prices building permits from the job value declared on the permit. The band below is the house-style sample. The schedule has no line named "commercial roof." We did not confirm a flat-roof job uses that sample, so we will not print a sample commercial fee. Call 509-625-6300, Development Services, 808 W Spokane Falls Blvd. Describe the squares and the system.
| Item | Figure | What it is |
|---|---|---|
| Building fee, $2,001 to $25,000 | $73 plus $13 per $1,000 | Or fraction, on the declared value over $2,000 |
| Processing | $65 | Added on that same schedule |
| Technology fee | 2.5% | On the 2026 city schedule |
| City sales tax | 9.1% | Oct. 1 through Dec. 31, 2026 |
| Valley sales tax | 9.0% | Same quarter |
| General bond | $30,000 | July 2026 state form |
| Specialty bond | $15,000 | Same form |
| Liability | $250,000 | Per event. L&I (the state agency that registers contractors) is the certificate holder |
Spokane Valley's re-roof application is written for re-roofs and asks about layers and a possible structural look. Permit center 509-720-5240. Confirm it is the right form for a commercial address. Valley wants the applicant to be the building owner or a contractor holding a Washington registration under chapter 18.27 RCW.
Sales tax on a Spokane city address is 9.1% from October 1 through December 31, 2026. Spokane Valley is 9.0%. The state rule generally puts retail sales tax on the full construction contract. Put tax on its own line so a "roof number" and a "with-tax number" are not the same sentence.
A declared job value is what the applicant writes on the permit. It is not a receipt, and it is not a promise of the low bid. For houses, the city file has a middle declared reroof value. That house file is the wrong yardstick for a store. We will not paste it here as a commercial price.
Warranties and the questions that matter
A manufacturer warranty and a workmanship warranty fail in different ways. The first is about the sheet or the panel. The second is about the crew. A bid that says "warranty" once, with no years and no name, has not offered either.
Who signs it, how many years, what voids it (ponding, coating, a rooftop unit), and whether it transfers if you sell.
Who repairs leaks from workmanship, for how long, and whether that firm must stay registered to keep the promise.
Take the registration number before you care about the warranty logo. Bond and insurance figures are in the table above. Per occurrence means per event. The form does not say which bond a roofing firm must post. Read the lookup.
What to refuse in a contract, including a deductible game on an insured loss, is written for homeowners and building owners alike on how to choose a roofer. RCW 48.30A.015 makes it unlawful to regularly waive or pay a property deductible. That pitch is not a discount.
Free for you. The roofing company pays us a flat monthly fee. The Day Company is a free matching service, not a contractor. Before you hire any roofer, check their registration with Washington L&I or the Idaho Contractors Board. We do not answer, record or receive these calls.
Who is allowed up there
Search Verify a Contractor by name, registration number, workers' comp account, or UBI (the state business ID). An ad with a name or an address must show the registration number.
If the name is not in the lookup, you do not have the state's bond and insurance record to point at. That is the practical risk. We will not write a legal opinion about who pays if an unregistered crew floods a store. Call your insurer and, if someone was hurt, get advice from a lawyer. The consumer line for insurance questions is 800-562-6900.
The number on this page rings one local roofer directly for a free inspection and a photo report. Use the report to check any other proposal. Ask that roofer, in the first conversation, whether they do low-slope commercial roofs. If they do not, say so and stop. We do not install, and we do not run a bidding war.
A homeowner claim, with the 10-day and 30-day clocks, is a different page. Building policies add their own notice rules. Nothing here says a commercial roof is covered.
Need eyes on a low-slope roof? Get matched with one local roofer for a free inspection and a photo report you can use before you sign.
Questions, answered
What is the difference between TPO, PVC, and EPDM?
They are three sheet types. TPO and PVC are plastics. EPDM is a rubber sheet. We do not have a primary source for how long each lasts in Spokane, so the useful difference is the one in the proposal: thickness, seams, and which warranty is actually offered.
How long does a flat roof last?
Built-up asphalt is listed at 12 to 25 years, and sheet metal at 20 to 50 or more, on a federal life table of typical ranges. TPO, PVC, and EPDM are not given years on that table. Do not treat a sales brochure as the same kind of source.
Can I coat a commercial roof instead of replacing it?
Sometimes, if the deck and the insulation are dry and the proposal says what the coating will not fix. A slogan that calls a coating a full replacement is marketing. Ask for a moisture check first.
What does a commercial roof cost per square foot in Spokane?
We will not print one. No primary commercial price list was found, and the house-reroof permit median is the wrong building. Get a scope, a declared permit value, and tax on a separate line.
Do I need a permit?
Plan on asking the city. The 2026 fee schedule prices building permits from the declared job value, and it has no line named commercial roof. Call 509-625-6300 and describe the work. In Spokane Valley, call 509-720-5240.
What if the roofer is not insured?
The state registration form requires liability insurance of $250,000 per occurrence and a bond. If the firm is not on the L&I lookup, that record is missing. Do not hire on a promise to "bring the certificate later" after the tear-off has started.
Does this service cover commercial roofs?
You can ask for one free inspection when you call. The roofer has to say whether they take low-slope commercial work. We do not keep a separate commercial crew list on this page.
How do I repair a leaking flat roof?
Blisters, open seams and shrinking flashing are field problems. Ponding, water that sits, can add to them. A roofer should show the source on a photo, say whether a patch, a coating or a tear-off fits, and put the area in writing. A coating does not dry wet insulation.
Read next
Sources and updates
Built on public data from the USDA Forest Service life table, the City of Spokane commercial application packet dated March 15, 2022, NOAA county wind counts, and the Washington contractor form revised July 2026.
Sources (15)
- USDA Forest Service, Building Condition Assessment, typical life expectancy, slide 33: Built-up asphalt 12 to 25 years, sheet metal 20 to 50 or more. Figures credit the National Roofing Contractors Association. Old table, typical ranges (read November 8, 2026).
- City of Spokane, Commercial application submittal requirements, March 15, 2022: 39 psf ground snow load in the commercial packet.
- City of Spokane Valley, Municipal Code SVMC 24.40: 39 psf ground snow load and 30 psf minimum roof snow load for the Valley code section.
- NOAA National Centers for Environmental Information, Storm Events bulk files: 32 thunderstorm-wind reports of 58 mph or more, and 4 hail days of 1 inch or larger, Spokane County, January 2016 through October 2026.
- National Weather Service, Historic November 2015 windstorm: 71 mph gust at Spokane airport on November 17, 2015.
- FEMA, OpenFEMA Disaster Declarations Summaries: DR-4249 and DR-1825 for Spokane County (read November 8, 2026).
- City of Spokane, Development Fee Schedule 2026: Building fees from declared job value. No line named commercial roof. 509-625-6300.
- City of Spokane Valley, Re-Roof Permit Application: Layers, possible structural analysis, 509-720-5240 (file dated February 2025).
- Washington Department of Revenue, Address rate lookup: City 9.1% and Valley 9.0%, October 1 through December 31, 2026 (read November 8, 2026).
- Washington State Legislature, WAC 458-20-170: Retail sales tax generally on the full construction contract.
- Washington State Department of Labor & Industries, Contractor registration form F625-001-000, rev. 07-2026: Bond amounts and $250,000 liability per occurrence.
- Washington State Department of Labor & Industries, Verify a Contractor: Lookup (read November 8, 2026).
- Washington State Legislature, RCW 18.27.100: Registration number on ads that show a name or address.
- Washington State Legislature, RCW 48.30A.015: Regularly waiving or paying a deductible is unlawful.
- Washington Office of the Insurance Commissioner, Filing a homeowner insurance claim: Consumer line 800-562-6900 (read November 8, 2026).
Changelog · 1 update, newest November 8, 2026
- November 8, 2026: First published.
How to cite this page: The Day Company, "Commercial roofing in Spokane, WA", updated November 12, 2026, https://theday.company/wa/roofing/spokane/commercial-roofing.
Reviewed is the last day a person re-checked every number on this page.
Single-ply life spans and commercial prices are omitted on purpose. The 39 psf figure is the ground snow load in a city commercial packet, not a forecast. The Day Company matches one local roofer for a free inspection. We do not install commercial roofs. See how we make money and privacy. The Day Company is a free matching service, not a contractor. Before you hire any roofer, check their registration with Washington L&I or the Idaho Contractors Board. We do not answer, record or receive these calls.