Do solar panels make sense in Oak Park?

The village fee and the historic check come first. Shade, roof direction and roof age still decide the fit.

See if solar fits my home →Free · ~60 seconds · No obligation
Published 7 min readBy The Day Company review team · How we verify figures
about 1,351 kWha year for each kW on a south roof with no shade
$175per system / unit on the 2026 electrical fee line
The short answer

It depends on the roof, the historic check and the bill. About 1,351 kWh a year for each kW of panels (NREL PVWatts model). The 2026 Oak Park fee schedule lists $175 per system / unit for an electrical job that includes a solar panel. The model aims south and leaves shade out. A kilowatt (kW) is the size of the set, and a kilowatt-hour (kWh) is the unit on a ComEd bill. A separate $150 line is a credit, not the permit fee. It is for a system that is not leased: you own the panels.

What do you need right now?
Check my eligibility →

The Day Company is an independent solar, battery and electricity information resource. Information you submit may be used by our review team and authorized partners to contact you about your request.

The 2026 fee schedule was updated January 26, 2026. Construction fees are effective March 1, 2026. Use the $175 line, not the older fee link.
about 1,351 kWha year for each kW on a south roof with no shade
$175per system / unit on the 2026 electrical fee line
$150credit for a non-leased renewable system, not the fee
39.7%of housing units are detached houses (9,862 of 24,872)

The 4 things to know

  • Use the 2026 fee schedule. The solar page still links a 2025 fee file.
  • The permit guide on that page is dated 2016. Confirm it with the village.
  • Some historic work needs a certificate. The historic page does not mention solar.
  • ComEd connects the panels. Oak Park has no village electric company.

Built on public data from: Oak Park village pages, the Census Bureau, and a National Laboratory of the Rockies PVWatts run.

Independent public sources we cite and link — The Day Company is not affiliated with or endorsed by any of them.

On this page
01 · Permit

What does Oak Park require?

Solar panels need a village permit. Start on the Solar Energy in Oak Park page. For the price, use the 2026 construction fee schedule. The fee link on the solar page still points at a 2025 file.

Email permits@oak-park.us or call 708-358-5430. The desk is the Permit & Development Division at Village Hall, 123 Madison Street, also listed on the building permits page.

Oak Park facts to check first
ItemWhat is publishedSource
Roof outputabout 1,351 kWh a year for each kWNREL PVWatts, south roof, no shade
Permit fee$175 per system / unit on the electrical line2026 schedule, effective March 1, 2026
Fee credit$150 for non-leased renewable generation2026 schedule and building permits page
Deskpermits@oak-park.us, 708-358-5430123 Madison Street

On September 16, 2025, the Village Board adopted the 2024 I-codes and the 2023 National Electrical Code for permits applied for after January 1, 2026. I-codes are the model building codes. The list is the 2024 building, home, existing-building, gas, mechanical, energy, and pool codes, plus the 2023 electrical code. The village posts its local amendments with them. The 2024 fire code took effect September 1, 2026. Plumbing stays the 2014 Illinois State Plumbing Code. Amendments are not yet on the AmLegal site, and no solar section is named. The code library contents do not show a solar chapter. Confirm any solar amendment with the village.

The solar page still links a permit guide with the footer 3-2016. It is dated 2016 and is not the placement rule in force. Confirm it with the village. That 2016 file asked for an application naming registered contractors, a site plan, a structural detail signed and sealed by an architect or structural engineer, manufacturer instructions, and an electrical plan. Treat that list as old and ask the desk for today's list. The 2026 fee sheet still lists a $200 fee for letting an unregistered contractor do the work.

The building permits page requires a permit for work under the building, electrical, mechanical, or plumbing code, or the zoning rules. Contractors need a certificate of insurance on file. ComEd's application is separate.

02 · Historic

What if the house is historic?

The historic page names three districts: Ridgeland/Oak Park, Frank Lloyd Wright-Prairie School of Architecture, and Gunderson.

A Certificate of Appropriateness is the village's written yes for some protected work. A landmark, or a contributing building (one that adds to the district), needs one for three kinds of work: full or partial demolition, an exterior change inside the lot lines that can be seen from the street or sidewalk, or work that uses municipal funding.

Interior-only work skips that path. Each of these also skips it on its own: a building that does not add to the district, work with no change in materials, or a restoration or work with limited effect on historic character. The page does not mention solar, so do not use the 2016 guide as the placement rule. Email Brenton Boitse at brenton.boitse@oak-park.us or call 708-358-5443. See Planning work on a building in a historic district.

Ask in writing: "Does this house need a Certificate of Appropriateness before panels go up?"

03 · Village fees

What will it cost in Oak Park?

The electrical line that includes a solar panel is $175 per system / unit. The sheet was updated January 26, 2026. Construction fees are effective March 1, 2026. Work started without a permit is listed at a $300 minimum or twice the permit cost. Confirm the line when you file.

The $150 line is a Sustainability Construction Fee Credit for renewable generation that is not leased. It is not the permit fee. If the listed product is not installed, the credit is lost.

Add $50 for ComEd's standard home application. A typical Illinois system of 9.4 kW costs about $34,000 to $35,000 before incentives ($3.62 to $3.73 a watt). Do not subtract a homeowner tax credit. It ended after December 31, 2025. See Illinois solar costs.

Check your solar price

Estimate from the Illinois Power Agency's cost model, Illinois Shines prices and the $300-per-kW rebate. Not a quote.

Type the price you were quoted. The tool compares it with the Illinois model and does not keep what you type. It does not figure the Oak Park fee.

04 · Roof output

How much power does one kilowatt make?

PVWatts is a federal model of a typical year. The model used 1 kW, 14% losses, a 25-degree tilt, and a south aim (azimuth 180). Shade was left out. The model returned 1,351.10 kWh, shown here as about 1,351 kWh a year for each kW of panels (NREL PVWatts model). See solar panels in Chicago for how direction changes output.

05 · Homes

What kind of houses are here?

The housing counts below are Census figures for Oak Park, 2020 through 2024. Owner-occupied homes are 14,037 of 23,387 occupied homes. Detached houses are 9,862 of 24,872, or 39.7%. The median value is $465,500. The median year built is 1938, and no error range is printed beside it. Use 1938 as the village figure, not as your roof's age. Ask a roofer how long the covering has left.

14,037Owner-occupied homes out of 23,387
39.7%Of housing units are detached (9,862 of 24,872)
1938Median year built
06 · Programs

Which local programs matter?

SolSmart is a program funded by the U.S. Department of Energy that rates how easy a town makes solar permits. The solar page calls Oak Park a SolSmart gold community and prints no year.

Switch Together is free to register, and you do not have to accept an offer. Named partners are the Midwest Renewable Energy Association and the Citizens Utility Board. Sign-up rounds close on set dates, so check that a round is open before you count on it.

The village buys power for homes in its aggregation plan from MC Squared Energy Services. The aggregation page says the supply rate is the same as the ComEd basic service rate and will not be higher. The page says the contract runs through 2028 and also says rates are guaranteed through the 3-year period of the supply agreement, so there is no one clear end day. Cancel any time, with no fee, at 855-259-1179. ComEd delivers the power and sends the bill.

The community solar page describes a subscription and points income-qualified homes to Illinois Solar for All. It prints no savings percent. The aggregation FAQ says that in the village program run by mc2, "20 percent of the solar energy produced by your solar farm share is credited to your ComEd account." That credit is not a rooftop discount. See community solar in Illinois.

ComEd delivers power and takes the solar application. Net metering is the bill credit for power you send out, and the village permit does not start it. See ComEd net metering.

Illinois Shines pays for renewable energy credits. Oak Park does not set that price. Who is paid is on Illinois Shines.

An Approved Vendor is a company the state lets handle those credits. Check the firm on how to check an Approved Vendor before you sign.

07 · Poor fit

When should you wait?

A stronger fit in Oak Park:

  • You own the roof, or you have the owner's yes in writing.
  • The roof covering still has many years left.
  • Historic staff have said whether a certificate is required.
  • The quote uses the 2026 fee schedule.

Pause first if:

  • The roof covering should be replaced before panels.
  • Shade falls on the roof for long parts of the day.
  • You rent, and the owner has not agreed.
  • A historic certificate is still open.
  • The power bill is small, so savings build slowly.

If trees or a taller building block the roof, have the shade measured. How shade changes the year is on shaded roofs.

Your next step

Use the free check on your Oak Park roof and bill before you compare quotes.

Read nextWhat your roof needs before solar Read it
08 · Quick answers

Questions, answered

How long does Oak Park take to review a solar permit?

No review time is printed on the solar page or the building permits page. Ask permits@oak-park.us or call 708-358-5430.

Is there a credit for a home battery?

A separate $150 credit is listed for energy storage tied to renewable energy. The generation credit is only for a system that is not leased. Each credit is lost if the listed product is not installed. Confirm both credits with the village.

Do panels raise property tax in Oak Park?

It can, unless you file. Illinois law, 35 ILCS 200/10-10, lets you file a claim with the chief county assessment officer. The assessor then uses the lower of two values: the home with a regular heating or cooling system, or the home with the solar system. Steps are on solar and property tax.

How does $175 apply in a multi-unit building?

The schedule prints $175.00 per system / unit and does not define the count. The same line covers solar panels, EV chargers and battery storage, and it does not say whether panels and a battery are one system or two. Ask the permit desk which count fits before you add up the fees.

Are solar setback distances published?

The permits page, the historic page and the code library do not print one. The 2016 guide is not the placement rule in force. Ask the desk before the layout is drawn.

Where to next

What do you want to do next?

See if your Oak Park roof can take solar.

Free check, about a minute. It says in plain words if shade or roof age makes solar a poor fit.

Free eligibility check · ComEd & Ameren · No obligation

The Day Company is an independent solar, battery and electricity information resource. Information you submit may be used by our review team and authorized partners to contact you about your request. Checking eligibility creates no obligation.

Sources

Sources and updates

Sources (14)
  • Village of Oak Park, Solar Energy in Oak Park: Permit needed. Page links the 2016 guide and a fee link that points at a 2025 file. Contact permits@oak-park.us or 708-358-5430. Calls Oak Park a SolSmart gold community and prints no date. Links ComEd rooftop resources. Does not print a review time. Read November 10, 2026.
  • Village of Oak Park, 2026 Construction Fees and Credits: Header: 2026 Construction Fees (updated 01/26/2026). Construction fees effective March 1, 2026. Electrical system installation, including a solar panel, $175.00 per system / unit. Credit: Renewable Energy – Generation (Non-leased system), $150. Section 7 says the ordinance is in effect on January 1, 2026. File linked from the building permits page as the construction permit fee schedule. Failure to install the listed product means loss of the credit. Electrical installation line covers wind turbine, solar panel, EV charger, ESS and other applicable work at $175.00 per system / unit. Other fees: allowing work by unregistered contractor(s) $200.00; work started without a permit, minimum $300 / 2x permit cost. Read November 10, 2026.
  • Village of Oak Park, 2026 Construction Fees: Same schedule text as the fees-and-credits file. Read November 10, 2026.
  • Village of Oak Park, Building Permits: Permit & Development Division, Development Services, Village Hall, 123 Madison Street, permits@oak-park.us, 708-358-5430. Construction permits for work covered by the building, electrical, mechanical, or plumbing code or the zoning ordinance. Contractors need a certificate of insurance on file. Sustainability Construction Fee Credit of $150 for renewable energy generation on a non-leased system, and $150 for an energy storage system tied to renewable energy. On September 16, 2025 the Village Board adopted the 2024 I-codes and the 2023 National Electrical Code for permits applied for after January 1, 2026. Effective January 1, 2026: 2024 IBC, 2024 IRC, 2024 IEBC, 2023 NEC, 2024 IFGC, 2024 IMC, 2024 International Energy Conservation Code, and 2024 International Swimming Pool and Spa Code, with local amendments. 2024 International Fire Code effective September 1, 2026. Plumbing remains the 2014 Illinois State Plumbing Code. Amendments are not yet updated on the AmLegal site. No solar-specific local section is named. No review time is printed. Read November 10, 2026.
  • Village of Oak Park, Solar panels guideline (file footer 3-2016): Dated 2016. Not the placement rule in force. Paper list to confirm with the village: completed application with registered contractors, site plan, structural detail signed and sealed by an architect or structural engineer, manufacturer instructions, electrical power plan. Read November 10, 2026.
  • Village of Oak Park, Planning work on a building in a historic district: Certificate of Appropriateness required for historic landmarks, and for projects on contributing resources in a historic district, when the work is full or partial demolition, an exterior change visible within the lot lines from the street or sidewalk, or work that uses municipal funding. Interior-only work, a non-contributing resource, no change in materials, or a restoration with limited effect on historic character does not take that path. Contact Brenton Boitse, brenton.boitse@oak-park.us, 708-358-5443. Districts: Ridgeland/Oak Park, Frank Lloyd Wright-Prairie School of Architecture, and Gunderson. The page does not mention solar. Read November 10, 2026.
  • American Legal Publishing, Oak Park code library: Table of contents does not show a solar chapter. Read November 10, 2026.
  • Switch Together, Oak Park home solar: Free to register. No obligation to accept an offer. Partners named: Midwest Renewable Energy Association and Citizens Utility Board. Sign-up rounds close on set dates. Read November 10, 2026.
  • Village of Oak Park, Community Solar: Describes a subscription. Points income-qualified households to Illinois Solar for All. Does not print a savings percent. Read November 10, 2026.
  • Village of Oak Park, Community Choice Aggregation: Supplier MC Squared Energy Services, extended through 2028. Rate is the same as the ComEd basic service rate and will not be higher. Extended through 2028, with no exact day. Cancel any time, no fee, 855-259-1179. FAQ also says rates are guaranteed through the 3-year period, so the end date is not one date. ComEd delivers and bills. FAQ: "20 percent of the solar energy produced by your solar farm share is credited to your ComEd account." Read November 10, 2026.
  • U.S. Census Bureau, American Community Survey 2020-2024 5-year, place 1754885 Oak Park village, tables B25003, B25024, B25077 and B25035: Owner-occupied 14,037 of 23,387 occupied homes. Detached houses 9,862 of 24,872 (39.7%). Median value $465,500. Median year built 1938. Census Reporter shows no margin of error on the year-built figure. Read November 10, 2026.
  • National Laboratory of the Rockies (formerly NREL), PVWatts v8: Model result 1,351.10 kWh per kW per year (about 1,351). Inputs: 1 kW, 14% losses, tilt 25, azimuth 180, module_type 0, array_type 1, no shade. Read November 10, 2026.
  • Illinois Commerce Commission, 83 Illinois Administrative Code 466 Appendix A: Application fee for a standard home system. Read November 10, 2026.
  • Illinois General Assembly, 35 ILCS 200/10-10: The owner may file a claim with the chief county assessment officer for an alternate value: the lesser of the value with a conventional heating or cooling system and the value with the solar system. Read November 10, 2026.
Changelog · 2 updates, newest November 10, 2026
  • November 10, 2026: Added links to related guides.
  • November 10, 2026: New page: Oak Park permit, fees, utility steps and homes, with sources.

How to cite this page: The Day Company, "Do solar panels make sense in Oak Park?", updated November 10, 2026, https://theday.company/answers/solar-panels-oak-park-il.

Reviewed is the last day a person re-checked every number on this page.

This page is information, not legal, tax or financial advice. Roof output is a model of a typical year with no shade. The permit fee comes from the 2026 construction schedule and should be confirmed with the village. The 2016 guide is old and is not the placement rule in force. The Day Company is not an installer or a government agency. The solar check on this page is run by The Day Company. Read the disclosure next to the button.

Check my eligibility →