IllinoisEvanstonPermitsRoofsReviewed

Do solar panels make sense in Evanston?

The city fee and the historic rules come first. Then look at shade, which way the roof faces, and how old the shingles are.

See if solar fits my home →Free · ~60 seconds · No obligation
Published 8 min readBy The Day Company review team · How we verify figures
about 1,353 kWha year for each kW on a south roof with no shade
2 percentbuilding permit share of construction cost when there is a contract
The short answer

About 1,353 kWh a year for each kW of panels (NREL PVWatts model). When there is a contract, the 2026 building permit is 2 percent of construction cost. The model uses a south-facing roof and leaves shade out. A kW is the size of the panel set. A kWh is the unit ComEd prints on the bill.

What do you need right now?
Check my eligibility →

The Day Company is an independent solar, battery and electricity information resource. Information you submit may be used by our review team and authorized partners to contact you about your request.

The text of the city's Solar Panel Guidelines is unconfirmed. If the house is historic, confirm panel rules at 847-448-8231 or preservation@cityofevanston.org before you draw a layout.
about 1,353 kWha year for each kW on a south roof with no shade
2 percentbuilding permit share of construction cost when there is a contract
$25 and upplan review, set by the job's value band
1953median year these houses were built

The 3 things to know

  • The August 2025 checklist does not print the Citizen Portal address.
  • One- and two-unit rooftop solar is the faster path. Ground-mount is not. No day count is printed.
  • A landmark or a home in a historic district needs a historic certificate first when the work shows from a street, alley or sidewalk.

Built on public data from: Evanston city pages, Census Bureau 2020-2024 tables, and a National Laboratory of the Rockies PVWatts run.

Independent public sources we cite and link — The Day Company is not affiliated with or endorsed by any of them.

On this page
01 · Permit

What does Evanston require?

Rooftop solar on a one- or two-unit home needs a building permit from Community Development, Building & Development Services. File in the online Citizen Portal. That job is the expedited path, meaning the faster route. The checklist gives no day count. Ground-mount and other solar cannot use that route.

Evanston facts to check first
ItemWhat is publishedSource
Faster pathOne- and two-unit rooftop. No day countChecklist, August 2025
OfficeBuilding & Development, 909 Davis Street. 847-448-8207. Inspections 847-448-4311 option 5Checklist, August 2025
PapersRegistered contractor, sealed drawings, specification sheets, structural report, signed contract with the costChecklist, August 2025
Ridge setback18 inches on each side of the ridge at or under 33 percent of the roof plan; 36 inches on each side over thatChecklist, August 2025
HistoricLandmark or historic-district home: certificate if the work is visible from the public wayPreservation page

The checklist does not print the portal address. An older file lists https://aca-prod.accela.com/Evanston/default.aspx . Confirm the live Citizen Portal at 847-448-8207 before you file.

The drawings must carry the seal of an Illinois design professional. A seal is the architect's or engineer's stamp, not just a signature. They show coverage percent, roof slope, pathways, attachment, flashing, a one-line diagram and wire calculations. A one-line diagram is a simple map of the power flow. An Illinois architect or structural engineer writes the structural report. Reviews are Architectural, Zoning, and Historic Preservation when it applies. The required inspection is an Electrical Final, plus Rough Structural only if the roof is reinforced. If the roof is too weak, the file needs reinforcement drawings and framing details.

The checklist uses the 2020 National Electrical Code as Evanston amended it, and 2021 IRC R324.6.2 for the ridge. A ridge setback is open roof at the peak for firefighters. Leave 18 inches on each side of the ridge when the array covers 33 percent or less of the roof plan. Leave 36 inches on each side when it covers more. The other fire access paths on the roof must also meet the 2021 IRC. Service-entrance cable is not allowed for the service riser or the service entrance to the panel. A-base and ring-style meter fittings are older meter-socket styles. They must be upgraded to a ringless fitting with a main disconnect.

The zoning rule for roof panels is unconfirmed. Ask at 847-448-8207 before you draw a layout.

Ask this in writing: "Is this one- or two-unit rooftop job on the expedited path, and does it need a Certificate of Appropriateness before you issue the permit?"

02 · City fees

What will it cost in Evanston?

The 2026 fee schedule has no flat solar row. With a contract, the building permit is 2 percent of construction cost. Plan review is $25 under $10,000, written as $0 to $9,999, $50 from $10,000 to $49,999, and $90 from $50,000 to $99,999. That price covers the first two reviews. Each review after that costs the same again. The electrical permit is priced from a worksheet. Its chart lists $40 for a new or changed circuit, plus $12 for each added circuit. A device that uses power is $25, plus $12 for each added device. A new or changed service up to 800 amps is $100. Each required trade inspection or reinspection costs at least $70, so a Rough Structural visit adds another $70 or more. If work starts before the permit is issued, the permit fee goes up by 50 percent.

Evanston electrical fees and inspections
ItemFeeSource
New or changed circuit$40, plus $12 for each added circuitFee schedule, 2026
Device that uses power$25, plus $12 for each added deviceFee schedule, 2026
New or changed service up to 800 amps$100Fee schedule, 2026
Each required trade inspection or reinspection$70 minimumFee schedule, 2026
Work started before the permitPermit fee goes up 50 percentFee schedule, 2026

When a historic review is required, the fee is $150 for minor work or $385 for major work. Ask the city which one your job is.

Plan review dollars and the inspection minimum
Under $10,000
$25 plan review
$10,000 to $49,999
$50 plan review
$50,000 to $99,999
$90 plan review
Trade inspection minimum
$70

2026 fee schedule. The 2 percent building permit is not a flat dollar.

ComEd's standard home application is $50, apart from the city fees.

A typical Illinois system is about 9.4 kW and about $34,000 to $35,000 before incentives ($3.62 to $3.73 a watt). See Illinois solar costs. Match a written quote to that range before you sign.

Check your solar price

Estimate from the Illinois Power Agency's cost model, Illinois Shines prices and the $300-per-kW rebate. Not a quote.

Evanston quotes are not one size. Enter the price you were given and see where it sits against the state model. The tool does not keep what you type.

Illinois Shines pays the state solar-credit money. That payment is separate from the city permit and from the ComEd bill credit. Who receives it is on Illinois Shines.

03 · Historic

What if the work is historic?

A Certificate of Appropriateness is the city's written yes for historic work. A landmark or a home in a historic district needs one when a permit is required. It applies when the work is visible from a street, alley or sidewalk. No building permit is issued until it is approved, either by the Preservation Commission at a public hearing or by the preservation planner. Routine maintenance means repair or replacement with no change in design, materials or look. It does not need an issued certificate, but you still submit the application. To check your home, open the city's About my Place tool and enter your address. Click Property Quick Info, then look at the Local Historic District and Historic Landmark tabs. Evanston also has National Register districts, but this certificate rule names local landmarks and local districts. Questions go to 847-448-8231.

04 · Roof output

How much power does one kilowatt make?

PVWatts is a federal model of a typical year. The opening figure is one PVWatts run. Inputs were 1 kW, 14 percent losses, tilt 25 degrees, aimed south, with no shade. The model returned 1,352.65 kWh for the year, shown above as about 1,353.

Shade or a roof that does not face south changes the total on that house. Direction examples next door are on solar panels in Chicago. Measuring shade is on shaded roofs.

05 · Homes

What kind of houses are here?

For 2020 through 2024, the Census Bureau counts 17,807 owner-occupied homes out of 31,705 occupied homes in Evanston city. Detached houses are 11,068 of 34,095 housing units (32.5 percent). Median home value is $481,200.

Median year built is 1953. That is the house, not the shingles. Ask how many years the surface has left. See what your roof needs. On a shared roof, get a yes from whoever can approve the work. Association limits are on HOA solar rights.

06 · Utility

Who delivers the power?

ComEd delivers the power and sends the bill. Evanston has no city electric utility. Contact ComEd before a supply-side connection, which ties the solar equipment on the utility side of the main breaker. The August 2025 checklist lists the service drop, riser, weather head, drip loop, attachment point and meter. Each must keep the clearances in the 2020 NEC, Article 230 and the ComEd Red Book. The standard home application is $50.

Net metering is the bill credit for power the panels send to the grid. The credit rules are on ComEd net metering.

Aggregation is a supply contract for homes that stay in. On January 12, 2026 the City Council approved a 36-month agreement with MC Squared Energy Services, from June 2026 through June 30, 2029. The city page says the rate is no more and no less than the ComEd default rate. You can opt out any time, with no fee, at 855-697-0285 or Evanston@mc2energyservices.com. ComEd still delivers and bills. See community choice aggregation. Net-metering customers should not join, that page says, because switching suppliers can wipe credits.

The city's community solar offer, through MC Squared and Soltage, saves a regular subscriber 10 percent of the community solar credits on the ComEd bill. There is no credit check and no sign-up or cancellation fee. Income-qualifying homes get 100 percent of the credits on the supply part of the bill, with one such spot for every 20 regular ones. Proof can be an Evanston Benefit Card, a Parks and Recreation Scholarship, or an independent income check. The city gives a $50 gift card for every 25 subscribers. Spots are limited and first come, first served. It needs ComEd basic service, so opt out of aggregation to receive it. Wider off-site shares are on community solar in Illinois.

The city solar page says Evanston won a SolSmart Gold award in October 2017. It does not change the permit fee. Evanston Sun Power, with partner Windfree Solar, is about 20 free installations for low- and moderate-income homes, up to 4 units. Read the 2026 guidelines on the Solar in Evanston page. The page also links the Solarize Chicagoland / Switch Together group buy (confirm if it is open) and the Illinois Homeowners' Solar Rights Act.

The checklist requires a contractor registered with the city. Ask for that before you sign, then use how to check an Approved Vendor.

07 · Poor fit

When should you wait?

A stronger fit in Evanston looks like this:

  • You can approve work on this roof.
  • The roof surface still has many years left.
  • The home is one or two units, on the faster rooftop path.
  • Any historic certificate you need is already approved.

Wait and clear the hold first if:

  • The roof covering should be replaced first.
  • Trees or a taller neighbor block the sun for hours.
  • You rent, or a shared roof has no yes yet.
  • The power bill is low, so savings build slowly.
  • A needed historic certificate is not approved yet.
Your next step

Run the free check on your Evanston roof and your ComEd bill before you set a quote side by side.

Read nextHow to vet a solar quote Read it
08 · Quick answers

Questions, answered

Will solar raise my Evanston property tax?

It can if you skip the claim. Under 35 ILCS 200/10-10, file with your county's chief assessment officer. The home is then valued the lower of two ways: with a regular heating or cooling system, or with the solar system. Steps are on solar and property tax.

What if the job is worth more than the plan-review bands on this page?

The 2026 table goes on: $150 from $100,000 to $149,999, $200 from $150,000 to $199,999, then a share of the work value. Call 847-448-8207 with your contract amount.

Can the owner file with no city-registered contractor?

The August 2025 checklist lists that contractor in the file. It does not describe an owner-builder form. Call 847-448-8207 before you file as the owner.

Should I subtract a federal tax credit from the Illinois price?

That homeowner credit ended after December 31, 2025. Do not subtract it here. See Did the tax credit end?.

Where is the ComEd Red Book?

The August 2025 checklist cites it and prints no web address. Ask ComEd or your contractor for the current copy before a supply-side connection.

Where to next

What do you want to do next?

See if your Evanston roof can take solar.

Free check, about a minute. It flags shade, an old roof or a small bill before you pay a deposit.

Free eligibility check · ComEd & Ameren · No obligation

The Day Company is an independent solar, battery and electricity information resource. Information you submit may be used by our review team and authorized partners to contact you about your request. Checking eligibility creates no obligation.

Sources

Sources and updates

Sources (10)
  • City of Evanston, Residential Solar Permit checklist (August 2025): Building permit for rooftop solar on one- and two-unit homes, filed in the online Citizen Portal. Portal address not in the checklist text. Office: Community Development, Building & Development Services, 909 Davis Street, 847-448-8207. Inspections 847-448-4311 option 5. Expedited path for rooftop photovoltaic on one- and two-unit homes. Ground-mount and other solar cannot be expedited. No day count. Papers: city-registered contractor, sealed drawings (coverage percent, slope, pathways, attachment and flashing, one-line diagram, wire calculations), structural report by an Illinois architect or structural engineer, specification sheets, signed contract with the cost, historic compliance if it applies. Approvals: Architectural Review, Zoning Review, Historic Preservation if it applies. Inspections: Electrical Final, and Rough Structural only if the roof is reinforced. Codes named: 2020 National Electrical Code as amended by Evanston, and 2021 IRC R324.6.2 ridge setbacks of 18 inches on both sides of the ridge at 33 percent or less of the roof plan and 36 inches on both sides when over 33 percent. All fire access pathways must comply with the 2021 IRC. Service entrance cable not permitted for the riser and service entrance to the panel. If the roof is structurally inadequate, reinforcement drawings and framing details are required. A-base and ring-style meter fittings must be upgraded to ringless main disconnect-type meter fittings. Contact ComEd before a supply-side connection. Checklist cites the ComEd Red Book. Read November 10, 2026.
  • City of Evanston, Final Permit Fee Schedule, accessible 2026: No solar flat line. Building permit 2 percent of construction cost when there is a contract. Plan review $25 for work valued under $10,000 ($0 to $9,999) and $50 for $10,000 to $49,999. Plan review $90 for $50,000 to $99,999, $150 for $100,000 to $149,999, $200 for $150,000 to $199,999, then work value times a rate. Plan-review fees include the first and second reviews; each review beyond two costs the original fee again. Electrical permit by worksheet: new or altered circuit $40, plus $12 per added circuit; new or altered service or feeder up to 800 amps $100. Minimum charge for any required trade inspection or reinspection $70. Electric motors and current-consuming devices $25, plus $12 per added device. Work started without a permit: permit fee increased by 50 percent. Historic preservation review: minor work on existing structures $150, major work (alterations and construction) $385. Read November 10, 2026.
  • City of Evanston, Older Citizen Portal address: Address from an older file. Not printed in the August 2025 checklist. Confirm the live portal with the city before you file. Read November 10, 2026.
  • City of Evanston, Historic preservation: Certificate of Appropriateness for landmark buildings and properties in historic districts when a permit is required and the work is visible from the public way (street, alley or sidewalk). No building permit until it is approved. Certificate approved by the Commission in a public hearing or by the Preservation Planner by administrative review. Routine maintenance (repair or replacement with no change in design, materials or general appearance) does not need an issued certificate, but the application is still submitted. Contact 847-448-8231. Status check: About my Place, enter address, Property Quick Info, Local Historic District and Historic Landmark tabs. Five National Register Historic Districts and four Local Historic Districts. Read November 10, 2026.
  • City of Evanston, Solar in Evanston: SolSmart Gold since October 2017. Evanston Sun Power: about 20 free installations for low- and moderate-income homes, up to 4 units, with 2026 guidelines linked. Community solar through MC Squared and Soltage: regular subscribers save 10 percent of the credits; income-qualifying residents get 100 percent of the credits on the supply part of the bill, 1 such subscription for every 20 regular ones; a $50 gift card for every 25 subscribers; limited, first come, first served; no credit check and no sign-up or cancellation fee; income proof by Evanston Benefit Card, Parks and Recreation Scholarship, or an independent income check. Free installs partner: Windfree Solar. Group-buy program linked. Illinois Homeowners' Solar Rights Act linked. Solar Panel Guidelines text unconfirmed. Confirm guideline text at preservation@cityofevanston.org or 847-448-8231. Read November 10, 2026.
  • City of Evanston, Community choice electricity aggregation: On January 12, 2026 the City Council approved a 36-month agreement with MC Squared Energy Services, starting June 2026 and ending June 30, 2029. Rate no more and no less than the ComEd default rate. Opt out any time, no fee, 855-697-0285 (Evanston@mc2energyservices.com). ComEd delivers and bills. Net-metering customers should not join aggregation because switching suppliers can wipe credits. Community solar requires ComEd basic electric service, so the city says to opt out of aggregation to receive that offer. Read November 10, 2026.
  • U.S. Census Bureau, American Community Survey 2020-2024 5-year, place 1724582 Evanston city, tables B25003, B25024, B25077 and B25035: Owner-occupied 17,807 of 31,705 occupied homes. Detached houses 11,068 of 34,095 (32.5 percent). Median value $481,200. Median year built 1953. Read November 10, 2026.
  • National Laboratory of the Rockies (formerly NREL), PVWatts v8: Model result 1,352.65 kWh per kW per year (about 1,353). Inputs: 1 kW, losses 14, tilt 25, azimuth 180, module_type 0, array_type 1, no shade. Read November 10, 2026.
  • Illinois Commerce Commission, 83 Illinois Administrative Code 466 Appendix A: Application fee for a standard home system. Read November 10, 2026.
  • Illinois General Assembly, 35 ILCS 200/10-10: The owner may file a claim with the chief county assessment officer for an alternate value: the lesser of the value with a conventional heating or cooling system and the value with the solar system. Read November 10, 2026.
Changelog · 2 updates, newest November 10, 2026
  • November 10, 2026: Added links to related guides.
  • November 10, 2026: New page: Evanston permit, fees, utility steps and homes, with sources.

How to cite this page: The Day Company, "Do solar panels make sense in Evanston?", updated November 10, 2026, https://theday.company/answers/solar-panels-evanston-il.

Reviewed is the last day a person re-checked every number on this page.

Numbers here are for reading, not for a tax return, a loan or a legal filing. The kilowatt-hour figure is one model year with shade left out. Fees and papers come from the August 2025 solar checklist and the 2026 fee schedule. Call the city before you rely on the portal link, the zoning rule, which is unconfirmed, or the historic guideline. The Day Company does not install solar and is not the city. The check button is ours. The disclosure beside it says how the check works.

Check my eligibility →