Do solar panels make sense in Naperville?

City power and a $132 permit come before the state price.

Published 8 min readBy The Day Company review team · How we verify figures
about 1,329 kWha year for each kW on a south roof with no shade
$132home solar permit on the 2025 checklist
Short answer

About 1,329 kWh a year for each kW of panels (NREL PVWatts model). The city's 2025 checklist prices a home solar permit at $132. The model used a south-facing roof and left shade out. A kW is the size of the panel set. A kWh is the unit on a Naperville Electric Utility bill.

Plans filed on or after April 1, 2026 use the 2024 codes and the 2023 National Electrical Code. The checklist (revised January 28, 2025) still cites 2018 path sizes. Confirm them with the city before you draw the roof.
about 1,329 kWha year for each kW on a south roof with no shade
$132home solar permit on the 2025 checklist
$1,750most the city incentive pays for an owned system
1990median year these houses were built

The 3 things to know

  • Check the capacity map before you file.
  • Confirm the dollar for any inspection past the two visits inside the $132 permit.
  • The bill credit follows the city utility agreement.

Built on public data from The City of Naperville, the U.S. Census Bureau and the National Laboratory of the Rockies PVWatts model.

01 · Permit

What does the city require?

Solar panels need a city permit before work starts. File in the Permitting, Plans and Licensing Portal (Civic Access) from the solar panels page. The electrical permit needs a Residential Load Calculation Worksheet.

Building Permits and Inspections is at 400 S. Eagle Street, Naperville, IL 60540. Call 630-420-6100 or email buildingpermits@naperville.il.us. The solar page footer also lists 630-420-6111. See the building permits page. The checklist header still says Transportation, Engineering and Development. Ask which desk has the file.

The 2025 checklist, revised January 28, 2025, says a complete file that meets city rules is typically ready in ten business days (Monday through Friday).

Bring a plat of survey or site plan. It must show the panels, inverters, combiner boxes, disconnects, the utility disconnect, meters and service panel. Add a sized roof plan. Add a structural letter from an Illinois design professional, or papers showing the roof meets the building code without an engineered letter. Also show framing, layer count, mounting details, fire class, a wire drawing, equipment sheets, the power rating, breaker sizes, the shutoff, and labels. The wiring heading is National Electrical Code 2017. A typical job needs a rough visit and a final. Book each one in the city portal or at 630-420-6100, option 1, at least 72 hours ahead. The listed hours are weekdays from 9 am to 1 pm and 2 pm to 4 pm.

For one- and two-family homes the checklist still cites 2018 IFC 1204.2.1 and 2018 IRC R324.6.1. The table shows the widths for a house without fire sprinklers. The checklist notes other widths for a house with sprinklers. Confirm the widths at 630-420-6100.

Roof paths on the 2025 checklist
PathSize printed there
Two pathsAt least two 36-inch paths on separate planes, from the low edge to the ridge, one on the street or driveway side
Plane with panelsA 36-inch path on that plane, the next plane, or across both
Ridge, array 33 percent or less18 inches on both sides
Ridge, array over 33 percent36 inches on both sides

Ordinance 26-010 (February 2026) covers plans filed on or after April 1, 2026. They are reviewed under the 2024 International Residential Code, the 2024 International Fire Code and the 2023 National Electrical Code. The other 2024 code books on the permits page, the 2018 Life Safety Code and the current Illinois Energy Conservation Code apply too. The checklist still cites 2018 books and the 2017 wiring code. The solar page also requires the National Electrical Safety Code.

A re-roof, or a change to panels already up, needs a new permit. The checklist cites 2018 IRC R908 and 2018 IBC 1511.3. Two or more layers come off before a new covering. The permits page does not restate that line. Confirm it at 630-420-6100.

02 · City power

How do you tie the system to city power?

Check a capacity map first. Naperville Electric Utility is at 1392 Aurora Avenue. Call 630-420-6059. Outages are 630-420-6060. The utility page says it serves more than 63,000 customers. The utility does not pick a separate supplier.

Naperville Electric Utility is the city's own utility. The 2026 rates page compares its bill with ComEd bills in nearby towns. If your bill comes from someone else, call 630-420-6059 before you plan. Use the city agreement, not ComEd net-metering steps.

Sign the interconnection agreement before tie-in. Signing uses tools the page names GovQA and DocuSign. Permission to operate follows a passed final inspection. The credit starts only after permission to operate and the signed agreement.

City credit rules
RuleWhat the agreement says
OffsetOne extra kWh offsets one kWh of the energy charge at that home
Does not reduceThe meter fee, a demand charge, and other charges
CarryUnused credits last until used, or until March 31
AprilExpired credits are paid at a code rate. The dollar is in the questions
CapOne megawatt AC, the size printed on the equipment

The 2026 rates page lists a $21.52 monthly customer charge, $0.11968 per kWh, and an 844 kWh example. The credit matches energy one kWh to one kWh. No cash export price is printed.

03 · City fees

What will it cost in Naperville?

The 2025 checklist prices a home solar job at $132: $18 clerical, $26 permit, and two inspections. The fee schedule prices each inspection at $44, inside the $132. Fees were last updated February 1, 2019 (Ordinance 18-145). The schedule page was updated October 11, 2022, and the January 28, 2025 checklist restates $132.

The dollar for a visit past those two is not settled. The checklist says $50. The October 11, 2022 schedule lists $44 per inspection and $68 for a reinspection. Ask 630-420-6100 which dollar applies now.

See how to vet a solar quote. A typical Illinois system is 9.4 kW and costs $34,000 to $35,000 before incentives ($3.62 to $3.73 a watt). Read Illinois solar costs. The 30% federal homeowner credit ended after December 31, 2025. See did the tax credit end.

04 · Roof output

What did the sun model return?

That figure is one PVWatts run from the National Laboratory of the Rockies: 1 kW, 14% losses, 25-degree tilt aimed south, no shade. It returned 1,328.63 kWh (about 1,329). See solar panels in Chicago and shaded roofs.

05 · Homes

What do the housing counts say?

Census counts for 2020 through 2024: 41,020 of 54,847 occupied homes are owner-occupied. Detached houses are 35,865 of 57,135, or 62.8%. Median value is $540,200. Median year built is 1990. See what a solar roof needs.

06 · City grant

Who can get the city incentive?

The incentive page pays up to $1,750, at $250 per kW of AC at the inverter (the power box), on the first 7 kW only. A larger system may still be built. The payment stops at $1,750. Call 630-305-5357. The system must be owned, not leased. One grant per household. You must already pay into the Renewable Energy Program, and keep paying at least $5 a month for five years after the award. Apply within 120 days of passing the final inspection. Payment is described as within two months after the application is fully processed, "as funds allow." Illinois Shines may apply if it is on the invoice or contract. The city names no state dollar. See Illinois Shines and ask how the two fit. Check the firm on how to check an Approved Vendor.

07 · Historic

What if the house is historic?

Section 6-11-8:2.15 calls for a Certificate of Appropriateness when solar on the main building would be seen from the street, looking straight at the front wall. File at least 21 calendar days before the Historic Preservation Commission meets. Use the certificate application. Confirm with the city.

08 · Poor fit

When should you wait?

A Naperville house is ready to price when:

  • You can approve work on this roof.
  • The covering has many years left.
  • The capacity map for this address is checked.

Wait when:

  • The covering should be replaced first.
  • Shade blocks the roof for much of the day.
  • You rent, or a shared roof has no yes.
  • The city bill is small, so credits grow slowly.
Your next step

Check the city capacity map for your address before you compare quotes.

Read nextHow to vet a solar quote Read it
09 · Quick answers

Questions, answered

What cash price is paid for credits that expire on March 31?

The agreement calls it the Expired Excess Energy Credit Purchase Rate, set in city code section 8-1C-4:14. Ask the utility at 630-420-6059 for the current rate.

What clock applies when the job is more than panels?

The permits page is not solar-only. A new house may take three to four weeks, and a fence or driveway may take less than one week. Ask 630-420-6100.

Do city pages set an association rule?

The city solar pages do not set one. See HOA solar rights, then confirm with the association.

Where are ground-mount distances?

The agreement points zoning to Title 6, Chapter 15 (Small Wind and Solar) of the city code. This guide does not quote that chapter. Ask 630-420-6100 for the distances that apply to your lot before you plan a ground mount.

Where to next

What do you want to do next?

Sources

Sources and updates

Sources (12)
  • City of Naperville, Solar Panels: Permit before install via the Permitting, Plans and Licensing Portal (Civic Access). Capacity maps before applying. Interconnection agreement signed before tie-in. Permission to operate after the final electrical inspection. Credit only after that permission and the signed agreement. Load worksheet on the electrical permit. New permit for a re-roof or a system change. NEC, NESC, and local building and fire codes. Footer phone 630-420-6111. Read November 10, 2026.
  • City of Naperville, Solar Checklist - 2025: Revised January 28, 2025. $132 ($18 clerical, $26 permit, two inspections). Extra inspection $50. Typically ten business days if complete and in line with city rules. Papers in the permit section. Wiring heading: National Electrical Code 2017. Paths cited to 2018 IFC 1204.2.1 and 2018 IRC R324.6.1: two 36-inch paths, a 36-inch path at the array, 18-inch or 36-inch ridge setback at 33 percent. Sprinkler widths noted. Layers: 2018 IRC R908 and 2018 IBC 1511.3. Rough and final. Historic section 6-11-8:2.15. Header still says Transportation, Engineering and Development. Read November 10, 2026.
  • City of Naperville, Interconnection Agreement: One extra kWh offsets one kWh of the energy component at that premises. The credit does not reduce the meter fee, a demand charge, or other charges. Credits carry until used or until March 31, then expire. April payment at the Expired Excess Energy Credit Purchase Rate, DPU-E Rate Schedule 8, section 8-1C-4:14. Cap: one megawatt alternating-current nameplate. Zoning: Title 6, Chapter 15. Read November 10, 2026.
  • City of Naperville, Building Permits: 400 S. Eagle Street, Naperville, IL 60540. 630-420-6100. buildingpermits@naperville.il.us. Fees last updated February 1, 2019. Order-received review. New single-family home may take three to four weeks. Fence or driveway may take less than one week. Not solar-specific. Ordinance 26-010, February 2026. Plans on or after April 1, 2026: 2024 International Residential Code, 2024 International Fire Code, 2023 National Electrical Code, other 2024 I-codes, 2018 Life Safety Code, current Illinois Energy Conservation Code. Inspections: option 1, Monday through Friday, 9 am to 1 pm and 2 pm to 4 pm, at least 72 hours ahead. Read November 10, 2026.
  • City of Naperville, Single Family/Small Residential permit fee schedule: Photovoltaic installation $132: $18 clerical, $26 permit, $44 per inspection, two minimum. Reinspection $68 (clerical plus inspection). Effective February 1, 2019, Ordinance 18-145. Page updated October 11, 2022. The $44 line is inside the $132. Read November 10, 2026.
  • City of Naperville, Electric Utility: City-owned Naperville Electric Utility, 1392 Aurora Avenue, 630-420-6059, outages 630-420-6060. More than 63,000 customers. Read November 10, 2026.
  • City of Naperville, Electric Rates: 2026 context: customer charge $21.52 a month, energy $0.11968 per kWh, example use 844 kWh. Compares a city bill with ComEd bills nearby. Does not say ComEd delivers inside Naperville. Credit is a kWh offset of the energy component. Read November 10, 2026.
  • City of Naperville, Solar Energy System Incentive: Up to $1,750 at $250 per kW AC at the inverter, counted only to 7 kW AC. Larger systems still cap at $1,750. Owned, not leased. Already in the Renewable Energy Program, then at least $5 a month for five years after the award. Apply within 120 days of passing the final inspection. One per household. Illinois Shines if on the invoice or contract. Payment described as within two months after processing. "As funds allow." 630-305-5357. Read November 10, 2026.
  • City of Naperville, Certificate of Appropriateness application: Form. Materials due at least 21 calendar days before the commission meeting. Read November 10, 2026.
  • City of Naperville, Municipal Code, Title 8: Named for the expired-credit rate. The dollar rate is not quoted here; ask 630-420-6059.
  • U.S. Census Bureau, American Community Survey 2020-2024 5-year, place 1751622 Naperville city, tables B25003, B25024, B25077 and B25035: Owner-occupied 41,020 of 54,847. Detached 35,865 of 57,135 (62.8%). Median value $540,200. Median year built 1990. Read on Census Reporter November 10, 2026.
  • National Laboratory of the Rockies (formerly NREL), PVWatts v8: 1,328.63 kWh per kW per year (about 1,329). 1 kW, 14% losses, tilt 25, azimuth 180, module_type 0, array_type 1, no shade. Lat 41.7508, lon -88.1535. Audit rerun November 10, 2026.
Changelog · 2 updates, newest November 10, 2026
  • November 10, 2026: Added links to related guides.
  • November 10, 2026: New page: Naperville permit, fees, utility steps and homes, with sources.

How to cite this page: The Day Company, "Do solar panels make sense in Naperville?", updated November 10, 2026, https://theday.company/answers/solar-panels-naperville-il.

Reviewed is the last day a person re-checked every number on this page.

This page is information, not legal, tax or financial advice. Roof output is a model of a typical year with no shade. Confirm the extra-inspection dollar, path sizes, and the layer rule with the city. Plans filed on or after April 1, 2026 use the newer codes. The Day Company is not an installer or a government agency.