On this page
Who issues solar permits in Aurora?
The Division of Building and Permits issues solar permits in Aurora. It is part of the City of Aurora's Development Services Department. One application covers rooftop and ground-mounted systems, for homes and businesses. Apply in the city's eTrakit online portal. You can also schedule inspections and check results there.
Division of Building and Permits — Address: 77 S. Broadway, 1st Floor, Aurora, IL 60505. Phone: (630) 256-3130. Hours: M–F 8am–5pm. Submittal email: bpcsrgroup@aurora.il.us. Revisions email: bprevisions@aurora.il.us.
How much does an Aurora solar permit cost?
Aurora prices permits by project valuation, not a flat solar fee. You pay a Permit Inspection Fee (PIF). For a one-trade job, it is 1.75% of your total cost of work. For a job that touches two or more trades, it is 2.5%. The trades are building/framing, electrical, plumbing and mechanical. On top of that come a Plan Review Fee equal to 15% of the PIF and a flat $23 Certificate of Completion. Aurora's fee schedule has no solar row, but the city's review-times sheet lists a $77 application fee for residential solar. That matches the fee for a 2-trade job (the 2.5% rate). Confirm with the city which rate applies.
Swipe the table sideways to see all columns →
| Fee component | How it's calculated | Notes |
|---|---|---|
| Permit Inspection Fee (PIF) | Valuation × 1.75% (single-trade) or × 2.5% (multi-trade) | Minimum $31 (1 trade) or $164 (2 trades); rounded up |
| Plan Review Fee (PRF) | PIF × 15% | Minimum $77 (1 trade) or $56 (2 trades) |
| Certificate of Completion | $23 flat | — |
| Application fee (deposit) | $56 (1-trade) or $77 (2-trade) | Credited toward your total; non-refundable |
| Third-party inspection report | Set by your contractor | Private cost, not set by the city |
| ComEd Level 1 interconnection | $50 application fee | Total capped at $200 under Illinois rule |
Estimate your Aurora solar permit fee
Enter your project's total cost of work. Your contractor uses the same number on the permit application.
Aurora's fee schedule has no solar row. The city's review-times sheet lists a $77 application fee for residential solar, which matches its 2-trade (2.5%) fee. Confirm with the city.
Estimate only. The city decides the final valuation and fee classification. This uses its 2026 fee schedule. The city adjusts its fees every year. If you apply in 2027, check the city's current schedule. Confirm with the Division of Building and Permits (630-256-3130). It does not include your ComEd interconnection cost or the required third-party inspection report.
What is Aurora's third-party inspection requirement?
Aurora requires a Third-Party Inspection Report. It covers the completed installation. It must reach the city before final inspection approval. Either of two groups can write it. One is an Illinois-licensed design professional (architect or structural engineer). The other is an independent certified solar inspection company. The report must cover all structural and electrical components. Your contractor arranges it. Make sure your quote says who pays for it (see how to vet a solar quote). It is billed separately from your city permit fee. The city doesn't publish a set price. Confirm the cost with your installer.
What documents do you need to apply?
Aurora's fillable solar application asks for a full package up front, not just a form:
- Completed application. It comes with construction drawings for both electrical and structural scope. A licensed design professional stamps or signs them (wet or digital)
- One-line electrical diagram
- Roof plan with dimensions. It shows panel and equipment layout, clearances, roof and supporting-wall construction
- NEC compliance details: interrupting rating, disconnect type, grounding, manufacturer labeling
- Building elevations showing fire-access points
- Equipment cut sheets and racking/attachment specifications
- An analysis of the existing roof. It covers age, materials, structural loading (see what your roof needs for solar in Illinois)
- The city's Solar Information Checklist and a signed third-party inspection agreement
General and electrical contractors must be licensed and registered with the City of Aurora. This must happen before the permit is issued. They need not be when you submit. Structural plans and calculations may be required. That depends on your system's scale and roof loading. Since January 1, 2026, Aurora uses the 2024 editions of the model building codes (the "I-Codes"). The city's solar form still lists older editions, the 2014 National Electrical Code and 2015 codes. Ask the city which edition applies.
How long does the Aurora permit take?
The city's own estimate for a residential solar plan review is 5 business days. The clock starts once your application is complete. Each round of corrections adds about 5 more. The estimate depends on workload. Total time runs from application to permission to operate. Your contractor's scheduling and ComEd's interconnection queue matter far more than the city's review. Treat any longer total-project estimate as covering the whole process, not just the city's review.
Do Aurora zoning or historic rules affect solar?
Solar is a by-right accessory use in every Aurora zoning district. The city approves it in the office. A standard residential system needs no special-use hearing. Ground-mounted systems follow the zoning code (§49-104.4(i)). It sets rules for clearance, quantity, height, and location. Ask the city for the exact standard. Building-mounted systems have their own placement and height rules. Panels on a wall are expressly allowed.
There are two exceptions. A home that is a designated local landmark needs a Certificate of Appropriateness in addition to the building permit. So does a home in a locally designated historic district. The certificate has its own application and review time. Homes in the Fox Walk district also need an extra application, with its own review time.
The city's posted solar guideline for historic homes turns on how visible the panels are:
| Where the panels would be | What the guideline says |
|---|---|
| Fully hidden from public view | Staff can approve |
| Can be seen only a little | Preservation Commission approval needed |
| Front yards, side yards seen from the street, the roof at the front of the house, roof slopes that face the street, or anywhere easy to see from the street, sidewalk or alley | Not allowed |
The city's older full guidelines are stricter: they say panels may not go anywhere they can be seen from the street. Confirm the current rules with the city's Historic Preservation staff.
If you're in an HOA, Illinois law (765 ILCS 165) bars associations from banning solar outright. They may set placement conditions. Those can't cut your system's estimated production by more than 10%. The Act does not cover buildings over 60 feet tall. It does not cover shared-roof buildings under an association, such as many condos and townhomes (see HOA solar rights in Illinois).
How does ComEd interconnection work in Aurora?
All of Aurora is ComEd territory. ComEd delivers your power and handles interconnection. Aurora also runs a city power-buying program (municipal electricity aggregation). It changes only your supply rate. It does not change who you interconnect with. Most home rooftop systems qualify for Level 1 interconnection. Level 1 has a $50 application fee. Illinois rule caps your total Level 1 interconnection cost at $200. You'll file a separate net metering application (see ComEd net metering). ComEd must approve your Certificate of Completion before the system operates.
Your installer also needs to be ICC-certified as a Distributed Generation Installer. Our guide to verifying an Illinois Shines Approved Vendor shows how to check that. It also shows how to check any Illinois solar company.
How is Aurora different from Chicago?
Both cities require their own city permit on top of state and utility steps. The mechanics differ. Chicago prices solar by system size, with a step at 13.44 kW. Aurora prices by project valuation. The table shows how each city reviews and checks the work.
| Step | Aurora | Chicago |
|---|---|---|
| Review | A short review of its own for residential solar | An Express Permit track up to 13.44 kW |
| Inspection | A third-party report on the finished installation | The Express Permit instead requires a licensed architect or structural engineer to inspect the roof and electrical system in person before you apply |
If you're comparing the two, see our Chicago solar permits guide.
Aurora Solar Permits FAQ
Do I need a permit to install solar panels in Aurora, IL?
Yes. A city solar permit from the Division of Building and Permits is required before any rooftop or ground-mounted installation.
How much does a solar permit cost in Aurora?
It's based on your project's valuation: a Permit Inspection Fee of about 1.75% (one trade) or 2.5% (two or more trades) of your total cost of work, plus a Plan Review Fee of 15% of that fee, plus a $23 certificate. Small jobs pay set minimums instead. Use the calculator above for your own number.
What is Aurora's third-party inspection requirement?
A completed-installation report from an Illinois-licensed design professional or a certified solar inspection company, covering structural and electrical work, required before the city's final approval. It's a separate, contractor-arranged cost.
How long does it take to get a solar permit in Aurora?
Aurora's estimate for a residential solar plan review is 5 business days, plus about 5 for each round of corrections. Total project timeline depends more on your contractor and ComEd's interconnection process than on the city.
Do I need special zoning approval for solar in Aurora?
No. Solar is a by-right accessory use in every zoning district, approved administratively — no public hearing required for a standard residential system.
What if my house is in a historic district?
You'll need a Certificate of Appropriateness in addition to your building permit. Staff can approve panels fully hidden from public view. Panels that can be seen only a little need Preservation Commission approval. Front yards, side yards seen from the street, the front roof and roof slopes facing the street are not allowed. Ask the city's Historic Preservation staff which rules apply.
Can my HOA block solar panels in Aurora?
Usually not, if you own a detached home. Illinois law (765 ILCS 165) prohibits HOAs from banning solar outright, though they can set reasonable placement conditions that don't reduce your system's estimated production by more than 10%. The Act does not cover buildings over 60 feet or shared-roof buildings under an association.
Is Aurora served by ComEd?
Yes — all of Aurora is ComEd territory for delivery and interconnection. The city's electricity aggregation program only affects your supply rate, not interconnection.
Do I need a separate ComEd application?
Yes. The city permit and ComEd's interconnection/net-metering application are separate processes. Most residential systems qualify for Level 1 interconnection, capped at $200 total.
Does my installer need to be certified?
Yes — Illinois requires ICC Distributed Generation Installer certification, and contractors must be licensed and registered with the City of Aurora. See our guide to verifying an Illinois solar installer.
Can I self-install solar in Aurora?
Self-installers are exempt from ICC DG certification but still need the city permit, the required documentation, and the third-party inspection report.
How is Aurora's process different from Chicago's?
Aurora prices by project valuation and requires a third-party inspection report on the finished installation. Chicago prices solar by system size, with a step at 13.44 kW, and its Express Permit (up to 13.44 kW) requires a licensed architect or structural engineer to inspect the roof and electrical system in person before you apply.
Related answers
See if your Aurora home is a good fit for solar.
Free, about a minute, no obligation — and if it isn't a fit, we'll say so.
Free eligibility check · ComEd & Ameren · No obligationThe Day Company is an Illinois solar and battery information resource — not the installer and not the city. We point you to Aurora's own primary sources so you can verify every fee yourself. Information you submit may be used by our review team and authorized partners to contact you about your request. Checking eligibility creates no obligation.
Sources
Sources (12)
- City of Aurora — Solar In Aurora
- City of Aurora — Solar Permit Application
- City of Aurora — 2026 Building Permit Fee Schedule
- City of Aurora — Permit review timeframes (residential solar: 5 business days)
- City of Aurora — Revised solar panel guideline for historic districts (marked-up "redline" version, no adoption date shown)
- City of Aurora — Historic Districts and Landmarks Guidelines (full, 2001, revised 2006)
- City of Aurora — Council File 25-0321, adoption of the 2024 I-Codes (effective January 1, 2026)
- Illinois Commerce Commission — Distributed Generation Installer Certification
- 83 Ill. Adm. Code 466.90 (Level 1 cost: $200)
- 83 Ill. Adm. Code 466, Appendix A (Level 1 application, $50 fee)
- ComEd — DER Interconnection Requirements for Interconnection Customers (Rev. 3, effective September 14, 2026)
- Illinois Homeowners' Energy Policy Statement Act, 765 ILCS 165 (full text, Secs. 15, 20 and 45) (ilga.gov)
How to cite: The Day Company Editorial Team, "How Do You Get a Solar Permit in Aurora, Illinois?," The Day Company, last updated November 3, 2026. https://theday.company/answers/aurora-solar-permits
Changelog · 3 updates, newest November 3, 2026
November 3, 2026 — Reworded in shorter sentences, with tables and cards for the historic-district rules, the review times, the ComEd fees and the Aurora versus Chicago comparison. Facts, fees, sources and links unchanged.
October 25, 2026 — Rechecked against the City of Aurora's permit pages. Review time now matches the city's own estimate (5 business days, plus about 5 per correction round). Minimum fee for 2-trade jobs fixed ($164) in the table and calculator. Historic-district and HOA rules made more exact. Aurora versus Chicago comparison corrected. Calculator rounding fixed. Sources and in-text links added.
August 6, 2026 — v1 published.