What are the steps, in order?
Illinois Shines is the state solar program. These are its steps, set next to the utility steps.
A disclosure form is the state paper you sign before the contract. It lists the price, the deposit, the warranties, and the dates.
- Sign the disclosure, then the contractYou get the form and a brochure first. The state filing cannot start until you sign.
- Design and permitThe installer designs the system and files the city or county permit. A homeowners association may have to approve it too.
- State form (Part I)The installer files Part I and has 14 days to fix errors. The Illinois Commerce Commission approves batches about 2 weeks apart.
- Utility formThe installer files with ComEd or Ameren. A normal home uses Level 1, with a $50 fee.
- InstallThe crew mounts the panels and the inverter. The disclosure form lists the start and finish dates.
- Inspection and testYour city or county inspects. Ameren runs a test visit. ComEd asks for inverter photos, inspection proof, and the drawings.
- Permission to operateThe utility signs off in writing. Then you switch on. Credits start within 1 to 2 months.
Level 1 is the expedited home track. Expedited means a set clock. An inverter turns panel power into home power. Permission to operate is the written yes to switch on.
After switch-on, the installer sends Part II. That form proves the system works. The state pays the installer, not you. On a system of 25 kW or less, 50% is paid up front, and the rest is paid quarterly over six years. See the Illinois Shines guide.
The steps overlap. File the utility form when the design is done. Do not wait for the roof work.
How long does each step take?
The state sets some of these times by rule. Your utility sets others. Some steps have no published time. The table says which. We read these sources on November 10, 2026.
| Step | Time allowed | Who sets it |
|---|---|---|
| Utility says your file is complete | 7 business days | Illinois Commerce Commission rule |
| You fix missing information | 10 business days, or the request is dropped | Illinois Commerce Commission rule |
| Utility checks your design | 15 business days after complete | Illinois Commerce Commission rule |
| You sign the utility agreement | 30 business days, then it is dropped | Illinois Commerce Commission rule |
| Ameren Illinois test visit | Within 15 business days of your done notice | Ameren Illinois guide, June 2023 |
| Ameren Illinois permission to operate | Usually 2 business days after the test | Ameren Illinois guide, June 2023 |
| Final hookup after inspection | Typically up to 10 business days | University of Illinois Extension |
| ComEd permission to operate | No time published | ComEd requirements, September 2026 |
| Illinois Shines Part I errors | 14 days to fix | Illinois Shines |
| State contract signed | One to two weeks after approval, then 7 business days | Illinois Shines |
| Finish the install | Up to 18 months after approval | Illinois Shines |
| Design and city permit | No time published. Ask your installer and your city | Local rules |
Add 7 days to 15 days. You get 22 business days. That is about four and a half weeks. It is the longest review on a complete file. A missing page adds a 10-day fix window. The wait can then reach 32 business days.
Three tests keep a home on this track. It sends 25 kW or less. It is 50 kW or less in total. The inverter is lab-certified. That means a test lab approved the gear.
Business days from Illinois Commerce Commission rules. The full review adds the first two bars.
A late filing costs you the most time. Some installers send the utility form only after the install. The whole review then sits at the end. The panels sit idle. Ask when they file.
Plan your own dates
Type the day you plan to sign. Type the times your installer quotes for design, permit, and inspection. The planner adds the published utility times. It shows when you could switch on.
Type the dates your installer quotes. The tool adds the review times the state and your utility publish, and shows when you could switch on.
This is a planning aid built from the published limits in the table above. Your installer and utility set the real dates, and weekends are the only days it skips.
What fees show up along the way?
Most of your cost is the system itself. Our cost guide covers that. These are the smaller fees tied to the steps.
| Fee | Amount | Where it comes from |
|---|---|---|
| Utility form for a standard home system | 50 | ComEd and Ameren Illinois guides |
| Most you can be billed for the Level 1 hookup | $200 cap. Costs above it go into delivery rates | Illinois Commerce Commission rule |
| Optional report on your circuit, before you apply | $300 at ComEd | ComEd requirements, September 2026 |
| Illinois Shines form fee | Must be shown on your disclosure form | Illinois Shines |
| City or county permit | Varies. Chicago lists its own | Chicago solar permits |
If a quote lists $200 as the form fee, ask why. That amount is a cost cap. The form fee in the guides is $50.
What do you do, and what does your installer do?
The installer files. An approved vendor is a company the state lets file Illinois Shines. Your own list is short.
- Read and sign the disclosure form before the contract. It lists price, deposit, warranties, and the planned dates.
- Pick the installer. Check the Illinois Commerce Commission certified list and the Illinois Shines approved-vendor list.
- Let the inspector in. Illinois Shines inspects a random share of projects at no cost to you. You may decline.
- Ask for written proof that net metering is set up. That is the bill credit for power you send back. See ComEd and Ameren.
- Do not file the Illinois Shines form. Only an approved vendor can.
- Do not switch the system on before the utility says yes.
- Do not climb on the roof for an inspection. The program tells customers not to.
Can you install solar panels yourself in Illinois?
Sometimes, but it is hard. A self-installer puts the system on their own land and takes no help. The utility needs your written statement that you are one before net metering.
Anyone else who connects it must be certified by the Illinois Commerce Commission. A friend does not count. An uncertified electrician does not count.
The city still permits and inspects. The utility still reviews the design. Illinois Shines still needs an approved vendor, or you may lose the state credit money. Ameren Illinois says solar is not a do-it-yourself project. We could not confirm a vendor will file for a system you built. Call (877) 783-1820 before you buy parts.
What slows an install down?
Most delays are paperwork, not roof work.
- A late or incomplete utility form. A missing page can add 10 business days before the 15-day check starts.
- Waiting on the state contract. Some installers wait for it before they start. Ask if yours does.
- A roof that needs work first. Taking panels off to re-roof costs money. The Illinois Solar Energy and Storage Association suggests at least 15 years of life left.
- An HOA review. A homeowners association cannot ban panels, but it can slow the plan. See what an Illinois HOA can require.
- Inspection scheduling. See Chicago and Aurora.
Is your home ready for these steps?
Solar is a poor fit on some homes. Know that before you sign.
See roof needs, shaded roofs, community solar, and selling a house with solar.
The free check looks at roof, shade, and usage. Prices are in what solar costs in Illinois.
What should I check before I sign?
Treat the disclosure form as the quote check. Price, deposit, warranties, and dates should be on it. So should the Illinois Shines dollars in your price.
- The utility fee is $50, not the $200 cap.
- Ask, in writing, how many credit dollars are in the price.
- The utility form waits until after the roof work.
What to demand is in how to vet a solar quote.
Who should install it?
Check the Illinois Commerce Commission list, the Illinois Shines approved-vendor list, and the complaint reports. The steps are in how to verify a vendor. We do not rank installers on this page.
Use the free check to see if your roof and bill make solar a fit before you sign a contract.
Questions, answered
How long does it take to install solar panels in Illinois?
Roof work is the short part. Utility review can take 22 business days. Then add the permit, the inspection, and the hookup.
Do you need a permit to install solar panels in Illinois?
Most cities and counties require one. Fees vary. See Chicago solar permits and Aurora solar permits.
Is it worth installing solar panels in Illinois?
It can be if you own the roof and ComEd or Ameren delivers power. The roof, your use, and the deal decide it. See the math in is solar worth it in Illinois.
What is the typical cost of installing solar panels in Illinois?
About $34,000 to $35,000 for a typical 9.4 kW system, before incentives. The 30% federal homeowner credit ended after December 31, 2025. Do not subtract it. See solar panel cost in Illinois.
Is the state of Illinois paying for solar panels?
No check comes to you. Illinois Shines pays your installer, who may lower your price. ComEd and Ameren pay a rebate too. Lower-income homes can use Illinois Solar for All. See ComEd's solar rebate.
What is the 33% rule in solar panels?
It is a fire-code limit on how much of the roof panels may cover. Wider walkways are needed past that share. Local code sets it. We found no Illinois statewide rule.
Why are people getting rid of their solar panels?
A new roof is the usual reason. You pay to take the panels off and put them back. Check roof age before you sign.
Who files the ComEd or Ameren application?
Your installer, in most cases. ComEd wants its online portal. Ameren Illinois uses PowerClerk. The home-system fee is $50.
When do bill credits start after install?
1 to 2 months after net metering is set up, Illinois Shines says.
What do you want to do next?
Check that your roof can take the seven steps.
See in about a minute if solar fits your roof. It's free, and if it's not a fit, it says so.
Free eligibility check · ComEd & Ameren · No obligationThe Day Company is an independent solar, battery and electricity information resource. Information you submit may be used by our review team and authorized partners to contact you about your request. Checking eligibility creates no obligation.
Sources and updates
Sources (12)
- Illinois Shines, Project Status: program steps: The seven program steps, 14-day error fix, ICC review rhythm, 18 months to install, 50% payment, credits in 1 to 2 months. Read November 10, 2026.
- Illinois Shines, Consumer FAQs: Approvals list, only an Approved Vendor may file, inspections, net metering enrollment. Read November 10, 2026.
- Illinois Shines, Explore Distributed Generation: What a Disclosure Form lists, including start and finish dates. Read November 10, 2026.
- Illinois Commerce Commission, 83 Ill. Adm. Code 466.80, Determining the Review Level: Level 1 limits: 25 kW export, 50 kW nameplate, inverter-based, lab-certified. Read November 10, 2026.
- Illinois Commerce Commission, 83 Ill. Adm. Code 466.90, Level 1 Expedited Review: The 7, 10, 15 and 30 business-day clocks and the $200 cost cap. Read November 10, 2026.
- Illinois Commerce Commission, Distributed Generation Installer: Installers must be certified, except self-installers (Part 468). Read November 10, 2026.
- Illinois General Assembly, 220 ILCS 5/16-128A: The self-installer definition and the utility's certification rule. Read November 10, 2026.
- ComEd, DER Interconnection Requirements for Interconnection Customers, Rev. 3 (September 10, 2026): $50 Level 1 fee, the certificate of completion, and the warning about switching on early. Read November 10, 2026.
- Ameren Illinois, Distributed Energy Resources Interconnection Policy Public Facing Guide (June 21, 2023): $50 Level 1 fee, the 15-business-day test and the 2-day permission to operate. Read November 10, 2026.
- Ameren Illinois, Customer-Owned Solar: Calls solar "not a DIY project" and says a certified installer submits the paperwork. Read November 10, 2026.
- University of Illinois Extension, Homeowner's Guide to Solar Energy: The order of permit, inspection and utility hookup, and "up to 10 business days after inspection approval." Read November 10, 2026.
- Illinois Solar Energy and Storage Association, The Solar Installation Process: The suggestion of a roof with 15 or more years left. Read November 10, 2026.
Changelog · 3 updates, newest November 10, 2026
- November 10, 2026: Added links to related guides. Re-checked every fact; changed the payment line from "50% is paid when it is energized" to "50% is paid up front, the rest paid quarterly over six years" (Illinois Shines Project Status says "upfront" and does not tie it to switch-on), and fixed a doubled percent sign.
- November 9, 2026: Rebuilt for easier reading: shorter sentences, a review-clock chart, and the same steps, fees, and clocks.
- October 25, 2026: Guide published.
How to cite this page: The Day Company, "How does solar panel installation work in Illinois, and how long does it take?", updated November 10, 2026, https://theday.company/answers/solar-panel-installation-illinois.
Reviewed is the last day a person re-checked every number on this page.
We are not part of Illinois Shines, ComEd, Ameren Illinois, or the Illinois Commerce Commission. Times and fees are the published limits on the read date. Your installer, city, and utility set the real dates. This page is information, not legal advice.