What you can see without a ladder
Stand back from each eave. A gutter that sags between hangers holds water. Water that sheets over the outside edge misses the downspout and soaks the bed below. Paint that peels under the eave has been wet for a while.
| What you see | Where | Why it matters |
|---|---|---|
| Sag between hangers | Any eave run | Standing water adds weight, then ice adds more |
| Overflow stain on the siding | Under the lip of the gutter | Water is missing the trough |
| Peeling paint at the eave | Fascia and the top of the wall | Wet wood hides behind the paint |
| Downspout dumping at the foundation | Ground under the outlet | Roof water belongs away from the wall |
| Gutter pulled off the fascia | After a wind or a snow slide | Hangers failed, or ice loaded the trough |
A square of roof is 100 square feet. Gutter length is not measured in squares. Walk the drip edge and note feet of trough, the count of corners, and the count of downspouts. That list is what a written price should match. Our winter roof prep page is the seasonal checklist that sits next to this one.
- Each downspout has a clear outlet and a path that leads water away from the house.
- Hangers still grip the fascia, with no daylight between the gutter and the board.
- Corners and end caps are seated, and seams are not dripping on a dry day.
- A ladder on wet or icy ground. The notes above are a ground-level pass.
- A guard or a new trough sold as the cure for ice at the eave.
Fix the run, replace it, or add a guard
A loose hanger is a different job from a trough that is crushed, split, or too small for the roof that drains into it. Guards are a third product. We found no government test that says a guard works in Spokane snow, and we found no government test that says a seamless trough lasts longer than a sectional one.
Seamless means the long runs are formed in one piece, with seams mainly at corners and outlets. Sectional means shorter lengths joined on site. Neither word appears in the city roof form or in the life table we used. Ask for the metal, the hanger spacing, and the size in inches on the quote. If those three lines are blank, the price is not comparable to any other price you already have.
Anyone who does this work for pay in Washington registers with Labor & Industries (L&I, the state agency that registers contractors). The bond, the insurance figure, and the ad rule are walked through on how to choose a roofer. A stack of stars is not that record.
Ice dams start above the gutter
An ice dam is a ridge of ice at the roof edge. It stops melting snow from draining off. University of Minnesota Extension, in a note reviewed in 2022, says a dam needs snow on the roof, the upper roof surface above 32 F, and the lower surface below 32 F. Heat flowing up from the house is the main cause. Controlling that heat is the prevention they describe.
The U.S. Department of Energy's Building America guide, updated December 6, 2022, says ice dams become unlikely when the ceiling is air-sealed, air can move from the soffit to the ridge with baffles, and the attic has a lot of insulation. The same federal guide says a dam can show up in a valley or against a chimney, not only along a straight eave. Those are roof details, not gutter brands.
A gutter can fill with ice and tear off the house. That is damage to the trough. It is not proof the gutter caused the dam. Heat from the rooms below is the cause named in the sources above.
Underlayment is the felt or synthetic sheet that sits beneath the shingles. The city's roof form wants an ice barrier, a tougher strip of that sheet, from the eave edge to at least 24 inches inside the outside wall. That rule is about the roof, and it is on the roof replacement page. Flashing is the metal that closes a gap at a chimney, a wall, or a vent. Ice that backs up under shingles looks for those gaps.
Avista pays an attic-insulation rebate on existing homes it heats with its electric or gas service. The dollar steps live on the winter page, because that rebate is about the attic, not about a trough. New construction is excluded from the rebate page we read, and no roof or ventilation rebate was listed there.
Snow load, the weight designers plan for, was not in a City of Spokane house table we could open. A 2022 city packet for commercial jobs shows 39 pounds per square foot on the ground. Spokane Valley's own code sets 39 on the ground and a 30 minimum on the roof. Those Valley pounds apply inside Valley city limits, and they should not be written onto a City of Spokane permit.
Wind is the storm the file actually counts
Hail is the smaller file. From January 2016 through October 2026, NOAA county records show 6 hail events of any size and 4 of 1 inch or larger. Three of those large-hail days were in August 2022. Wind of 58 mph or more (50 knots) was reported 32 times. Forecast-zone high-wind warnings are not inside that 32.
NOAA NCEI Storm Events, county records. A quiet year in the file is not a calm promise. High-wind warnings logged by forecast zone are excluded.
On November 17, 2015, the weather service measured a 71 mph gust at the Spokane airport. That day is also FEMA disaster DR-4249 for this county, severe storms and straight-line winds, incident date November 12, 2015, declared January 15, 2016. A fire-safety note we read treats gutters, vents, and roofs with many joints as weak points when embers move, even when the roof itself is rated to face severe fire. The note dates county fires to August 2023. Clean troughs are part of that note. They are not a hail plan.
- Record snowFEMA DR-1825. Incident Dec. 12, 2008. Declared Mar. 2, 2009. Snow load, not a trough brand.
- Straight-line windsFEMA DR-4249. Incident Nov. 12, 2015. Declared Jan. 15, 2016.
- Winter stormsFEMA DR-4309. Incident Jan. 30, 2017. Declared Apr. 21, 2017.
- Winter storm and windFEMA DR-4593. Incident began Dec. 29, 2020. Declared Apr. 8, 2021.
The OpenFEMA pull for this county also had no wind or winter declaration tied to the 2021 heat wave, and none tied to January 2024.
The dollars we can source, and the ones we will not
A U.S. Forest Service training slide lists gutters and downspouts at 30 years. The slide calls these typical ranges. It is old, and it credits other groups for some roofing lines. It is not a Spokane warranty and not a price.
Sales pages we saw printed wide gutter ranges and did not show a public source. Those ranges are not repeated here. A fair price is a written count of feet, corners, outlets, size, and metal, plus tax on its own line.
Washington's tax rule, WAC 458-20-170, says a prime contractor collects retail sales tax measured by the full contract price on construction for a consumer. The rule text we fetched does not say the word "gutter," so treat it as the general rule and ask the Department of Revenue if a pure repair is handled the same way. For October 1 through December 31, 2026, the department's rate for the City of Spokane is 9.1%. Spokane Valley's rate for that same quarter is 9.0%, and it does not belong on a city job. Land outside both cities was missing from the rate file we kept.
City permit reports we parsed are house reroofs. The middle declared value on the clean set is $12,800. That figure is the job value written on a roof permit. It is not a receipt, and it is not a gutter bid. The full roof math is on the replacement cost page. Using it as a gutter budget would mix two trades.
Shingle makers' prices, tracked by a federal index, moved about 45% from January 2020 to September 2026. That index is asphalt shingles and coatings. It does not price aluminum trough.
Free for you. The roofing company pays us a flat monthly fee. The Day Company is a free matching service, not a contractor. Before you hire any roofer, check their registration with Washington L&I or the Idaho Contractors Board. We do not answer, record or receive these calls.
What to ask before you pay
The quote is the place the missing facts have to show up. Brand names and star counts do not fill the blanks.
Linear feet, inches of trough, hanger spacing, and the count of downspouts.
The L&I number on the estimate matches the state lookup. Bond and insurance details are on the choose-a-roofer page.
If the work touches shingles, ice barrier, or the wood at the eave, the roof rules start to matter. A photo report from one free inspection is the record you keep. You may hire that roofer or not. The Day Company does not climb, and the call rings one roofing company directly.
Use the photos to check any other gutter or roof price you get on your own. We do not line up several companies.
Walk the eaves from the ground, then ask for one free roof inspection. The photo report shows whether ice at the gutter is really an attic problem.
Questions, answered
How often should I clean gutters in Spokane?
We did not find a city rule that sets a cleaning schedule. A ground-level look after leaves drop, and again after a wind event, matches the damage the storm file actually records. Wind of 58 mph or more was logged 32 times in the county from 2016 through October 2026.
Do gutter guards work in snow?
We found no independent test for Spokane snow. A cover does not stop heat from leaving the house, and that heat is what University of Minnesota Extension names as the main cause of ice dams. Ask what the cover does when wet snow slides, and get that answer in writing.
Do gutters cause ice dams?
The sources we used do not say that. An ice dam is a ridge of ice at the roof edge that blocks meltwater. It forms when the upper roof is above 32 F and the lower roof is below 32 F, mainly because heat rises from the house. A gutter can still be torn off by the ice.
Are seamless gutters better than sectional ones?
No government comparison we read picks a winner for this climate. Seamless runs have fewer joints along the length. Sectional runs are joined on site. The quote should still list metal, size, and hanger spacing either way.
Do I need a permit to replace gutters in Spokane?
The city form we read is titled for roofing, siding, and windows, revision August 19, 2020, and the lines we could use are roof lines. A gutter-only permit rule was not in that set. Call 509-625-6300 at 808 W Spokane Falls Blvd before you assume the job is exempt.
What is a fair price per foot for gutters?
We will not print one. The ranges on sales pages had no public source. A usable price lists feet, corners, outlets, size, and tax. City reroof permits are a different job. Their middle declared value, $12,800, is not a gutter number.
Should I buy 5 inch or 6 inch gutters?
We did not find a Spokane code line that chooses one. Ask the installer to match the roof area that drains to each run, and to write the size on the quote. Bigger is not automatically right if the outlets and downspouts stay small.
Read next
Sources and updates
Built on public data from NOAA storm records for Spokane County, a U.S. Forest Service life table, University of Minnesota Extension and a federal attic guide on ice dams, the Washington sales-tax rule, and the Department of Revenue city rate, read Nov. 8, 2026.
Sources (15)
- NOAA National Centers for Environmental Information, Storm Events bulk files: Spokane County hail and thunderstorm-wind counts, January 2016 through October 2026.
- National Weather Service, Historic November 2015 windstorm: 71 mph gust at Spokane airport on November 17, 2015.
- FEMA, OpenFEMA Disaster Declarations Summaries: DR-1825, DR-4249, DR-4309, and DR-4593 for Spokane County (read November 8, 2026).
- University of Minnesota Extension, Dealing with and preventing ice dams (reviewed 2022): Ice dam definition, the 32 F split, and heat loss as the main cause (read November 8, 2026).
- U.S. Department of Energy, Building America Solution Center (PNNL), Construct Roofs and Attics for Ice Dam Prevention (updated December 6, 2022): Air sealing, soffit-to-ridge airflow with baffles, attic insulation, and dams at valleys and chimneys.
- USDA Forest Service, Building Condition Assessment, typical life expectancy, slide 33: Gutters and downspouts listed at 30 years. Old typical ranges (read November 8, 2026).
- City of Spokane, Roofing, Siding, Windows Permit Application, rev. 20200819: Ice barrier to 24 inches inside the wall. No gutter-only line in the rules we used. Contact 509-625-6300.
- Washington State Legislature, WAC 458-20-170: Retail sales tax measured by the full contract price on construction for consumers.
- Washington Department of Revenue, Address rate lookup: Spokane city 9.1% and Spokane Valley 9.0% for October 1 through December 31, 2026 (read November 8, 2026).
- City of Spokane, Daily Activity Report, example February 2, 2025: House reroof declared values. Clean-set median $12,800 is a roof figure, not a gutter price.
- Federal Reserve Bank of St. Louis, Producer Price Index, asphalt shingle and coating materials, PCU324122324122: Shingle maker index, about 45% higher in September 2026 than in January 2020. Not a gutter price.
- Avista, Home insulation rebate: Attic insulation rebate on existing Avista-heated homes. No roof or ventilation rebate listed (read November 8, 2026).
- City of Spokane, Commercial application submittal requirements, March 15, 2022: 39 psf ground snow load in a commercial packet. Residential city number not verified.
- City of Spokane Valley, Municipal code snow amendment: 39 psf ground snow load and 30 psf minimum roof snow load (read November 8, 2026).
- Washington Military Department and Idaho Firewise, Fire-safety notes cited in our research file: Class A roofs and weak points at gutters, vents, and complex roofs. August 2023 fires reached Spokane County. Also https://idahofirewise.org/firewise-homes/firewise-building-materials/
Changelog · 1 update, newest November 8, 2026
- November 8, 2026: First published.
How to cite this page: The Day Company, "Gutters in Spokane, WA", updated November 12, 2026, https://theday.company/wa/roofing/spokane/gutters.
Reviewed is the last day a person re-checked every number on this page.
The Day Company matches you with one roofer. Check their registration with Washington L&I before you hire. We do not install gutters, climb roofs, or pay deductibles. The 30-year life line is a typical range from an old federal slide, not a warranty. Permit dollars cited here are roof jobs. Confirm the 2020 city form and the Avista rebate page before you rely on either. How the match is paid is on how we make money. Requests are described on our privacy page. The Day Company is a free matching service, not a contractor. Before you hire any roofer, check their registration with Washington L&I or the Idaho Contractors Board. We do not answer, record or receive these calls.