On this page
What does the village require?
Check the local facts first. Then use the village checklist, and confirm it is still current.
| Item | What is published | Source |
|---|---|---|
| Roof output | about 1,363 kWh a year for each kW | NREL PVWatts, south roof, no shade |
| Permit | A building permit is required | Village checklist, updated October 15, 2020 |
| How to file | Email Building@vah.com. No online portal is named | Village 2020 checklist |
| Fee | Shown when the permit is ready. No formula is published | Village 2020 checklist |
| Review | Allow 10 working days. A revision can add 10 more | Village 2020 checklist |
| Homes | 33,005 homes. 17,642 are detached (53.5%) | Census ACS 2020-2024 |
| Owner-occupied | 23,288 of 31,466 occupied homes | Census ACS 2020-2024 |
| Year built | Median 1974 | Census ACS 2020-2024 |
| Home value | Median $414,500 | Census ACS 2020-2024 |
Email the packet to Building@vah.com. The checklist says to expect a receipt within 24 hours. The office is Building & Life Safety, 33 S. Arlington Heights Rd. Call 847-368-5560.
A working day skips the weekend. Each revision can add 10 more working days. That time is from the 2020 checklist. It is planning time, not a promise of a faster yes.
Inspections are required. Call one day ahead. The village contractor license number must be on the forms. Look it up on the village permits page. If you do the work yourself, the checklist asks for a Homeowner as General Contractor form.
We did not find code text on solar setbacks. Historic-building rules were not found either. Extra ground-mount limits beyond the checklist were not found. Confirm those points with the village.
| Paper | Plain meaning |
|---|---|
| Building permit application | The main village form |
| Electrical permit, if it applies | Include a copy of the electrical license |
| Scaled plans | Drawings with sizes marked. A seal is not required |
| Plat of survey | A map of your lot |
| Contractor proposal | The written offer for the work |
| Marked-up site plan | The lot map with the panels drawn on it |
| Wiring drawings | Drawings of how the wires run |
| Structural calculations | Math showing the roof can hold the weight |
- Email the packetSend it to Building@vah.com. Watch for a receipt within 24 hours.
- Plan reviewAllow 10 working days. A revision can add 10 more.
- Pick up the permitThe ready note shows the fee. No set price is published.
- InspectionCall Building & Life Safety one day ahead.
The checklist PDF is Solar Panel Installation - Residential.
What will it cost in Arlington Heights?
The village does not post a price list for solar. You learn the permit fee when the permit is ready for pick-up. Ask Building & Life Safety for an estimate before you sign with a firm. Budget in two parts. The village shows its fee at pick-up. ComEd's standard home application is $50. Panel prices themselves are covered in Illinois solar costs.
An electrical permit may be a second fee. The checklist says "if applicable" and asks for a copy of the electrical license. Each plan revision can add 10 working days, so a clean first file saves time.
A typical Illinois system is about 9.4 kW and costs $34,000 to $35,000 before incentives. Only 53.5% of Arlington Heights homes are detached, so many owners share a roof. Judge it per watt instead: the state range is $3.62 to $3.73. Type the price you were quoted and see how it lines up.
Estimate from the Illinois Power Agency's cost model, Illinois Shines prices and the $300-per-kW rebate. Not a quote.
Quotes in Arlington Heights vary, so type yours in and the page shows where it lands against the state's cost model. It never saves your number.
How much power can your roof make?
The run used a 1 kW system and 14% losses. Tilt was 25 degrees, facing south. It assumes no shade. This is the highest of the seven north-suburb towns we checked in November 2026, but the town-to-town gap is only about 2%. That is model noise.
A roof that faces east or west makes less. See how direction changes output for solar panels in Chicago. Trees near the lot matter too. Measured shade is on shaded roofs.
What kind of homes are here?
Only 53.5% of homes are detached houses. That is a low share. The rest are condos, townhomes and small buildings. Owners there often share a roof, so panels are not one person's choice.
The median build year is 1974. That is a house date. The roof on a 1974 house may be much younger or close to done, so ask before you plan. If it is near the end, plan the new roof first. See what your roof needs.
The village page does not state an association rule. Confirm with the village, then read HOA solar rights.
Who sends the electric bill?
ComEd delivers the power in Arlington Heights. The village's 2023 page says it is not in an aggregation plan, because rates were high. Aggregation is a town plan that buys power for many homes. The page says customers who were on the plan return to ComEd automatically. The note may be out of date, so confirm it with the village. The same page points solar questions to ComEd. Credits for exported power are on ComEd net metering. Who gets the state money is on Illinois Shines.
Who files and who checks?
The permit forms must show a village contractor license number. If a seller cannot give one, stop. Then check the firm on the state list with the state check.
When is solar a poor fit here?
Signs an Arlington Heights roof is ready:
- You own the roof you want to use.
- The roof still has years of life left.
- Sun hits that roof for most of the day.
Pause if any of these match your house:
- The roof needs replacement before any panels.
- A condo or townhome association has not agreed.
- Trees or a taller house block the sun for much of the day.
- You will move before the savings add up.
If the roof is not yours, see community solar. That is a share of a larger array, with no panels on your house.
Use the free check to see if your Arlington Heights roof and bill make solar a fit before you compare quotes.
Questions, answered
Can a homeowner file the Arlington Heights solar permit?
The 2020 checklist says yes if you do the work. File a Homeowner as General Contractor form. You still need the plans and the plat. Confirm the form is current.
When is the electrical permit required?
The checklist says to add an electrical permit "if applicable." Include a copy of the electrical license. It does not define when that permit applies. Ask the village before you skip it.
What if the panels will sit on the ground?
Add a site plan with the distance to two crossing lot lines. Add drawings and a topography and grading plan. That plan shows the slope and how water runs. Confirm setbacks with the village.
Does Arlington Heights pay a village solar rebate?
The village pages we read do not list one. That means we did not find a rebate. It does not mean the rebate is zero. Confirm with Building & Life Safety.
Will solar raise my Arlington Heights property tax?
Not if you file one form. Send Form PTAX-330 to the county assessor after the panels are in. The county then must use the lower of two values: your home with a regular heating and cooling system, or your home with solar. Skip the form and the break does not apply. The steps are in solar and property tax.
Does the 1,363 kWh figure include winter?
No. It is one full-year model with no shade. Months are not split out. See solar panels in an Illinois winter.
What do you want to do next?
See if your Arlington Heights roof can take solar.
Free check, about a minute. It says so plainly if your roof, shade or home type makes solar a poor fit.
Free eligibility check · ComEd & Ameren · No obligationThe Day Company is an independent solar, battery and electricity information resource. Information you submit may be used by our review team and authorized partners to contact you about your request. Checking eligibility creates no obligation.
Sources and updates
Sources (7)
- Village of Arlington Heights, Solar Panel Installation - Residential (checklist PDF): Building permit, email to Building@vah.com, receipt within 24 hours, fee shown when the permit is ready, 10 working days plus 10 after a revision, rooftop papers, no architect seal required, inspections one day ahead, ground-mount papers, Homeowner as General Contractor form. Office: Building & Life Safety, 33 S. Arlington Heights Rd, 847-368-5560. Checklist last updated October 15, 2020. Read November 10, 2026.
- Village of Arlington Heights, Permits and licenses: Village contractor license lookup. Read November 10, 2026.
- Village of Arlington Heights, Electric aggregation: As of November 2023 the village is not in an aggregation program because rates were high, and those customers return to ComEd automatically. The page may be out of date. It points solar to ComEd. Read November 10, 2026.
- U.S. Census Bureau, American Community Survey 2020-2024 5-year, place 1702154, tables B25003, B25024, B25077 and B25035: Owner-occupied 23,288 of 31,466 occupied homes, detached houses 17,642 of 33,005 (53.5%), median value $414,500, median year built 1974. Read November 10, 2026.
- National Laboratory of the Rockies (formerly NREL), PVWatts v8: Model result 1,363.37 kWh per kW per year (about 1,363) at the village point above, 1 kW, 14% losses, tilt 25, azimuth 180, no shade. Read November 10, 2026.
- Illinois Commerce Commission, 83 Illinois Administrative Code 466 Appendix A: Application fee for a standard home system.
- Illinois General Assembly, 35 ILCS 200/10-10: After the owner files, the county uses the lower of the regular-system value and the solar value.
Changelog · 3 updates, newest November 10, 2026
- November 10, 2026: Added links to related guides. Re-checked every fact; all matched the village checklist and permit page, Census and PVWatts, and the source dates are updated.
- November 9, 2026: Cut repeated state sections; added local costs and facts.
- November 9, 2026: New page: Arlington Heights permits, roof output and homes, with sources.
How to cite this page: The Day Company, "Do solar panels make sense in Arlington Heights?", updated November 10, 2026, https://theday.company/answers/solar-panels-arlington-heights-il.
Reviewed is the last day a person re-checked every number on this page.
This page is information, not legal, tax or financial advice. Output is a model of a typical year with no shade. Permit steps come from the village's 2020 checklist and should be confirmed with the village. The Day Company is not an installer or a government agency. The solar check on this page is run by The Day Company. Read the disclosure next to the button.